6 in 60 Milestones: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 6: | Line 6: | ||
We are at June 12, and expect: | We are at June 12, and expect: | ||
*Wikispeed car frame - suspension, rear drive, steering, and new 50 HP power cube to be finished. | *Wikispeed car frame - suspension, rear drive, steering, and new 50 HP power cube to be finished. | ||
**50hp Engine arriving on Friday, June 14. Recruited local VW master, [[Danny Brown]] - to help on car parts. Recruiting a local TIG welder for aluminum power cube fabrication. Working with [[Mike Hill]] for other CNC Torch Table Cutting. [[Tom Griffing]] did initial 50hp Power Cube work. | **50hp Engine arriving on Friday, June 14. Recruited local VW master, [[Danny Brown]] - to help on car parts. Recruiting a local TIG welder for aluminum power cube fabrication. Working with [[Mike Hill]] for other CNC Torch Table Cutting. [[Tom Griffing]] did initial [[50hp Power Cube]] work. |
Revision as of 21:53, 12 June 2013
- The 6 in 60 Campaign promised the Microtractor, Bulldozer, Car, Truck, Backhoe, and Ironworker Machine. Current activity is in the Dashboard.
- Finishing these modules: Cab, Loader, Power Cube, Wheel, and Pivot. Not to mention the wheel base unit.
- At the same time, we are working on a build of the CNC torch table.
How well will this be finished? We are at June 12, and expect:
- Wikispeed car frame - suspension, rear drive, steering, and new 50 HP power cube to be finished.
- 50hp Engine arriving on Friday, June 14. Recruited local VW master, Danny Brown - to help on car parts. Recruiting a local TIG welder for aluminum power cube fabrication. Working with Mike Hill for other CNC Torch Table Cutting. Tom Griffing did initial 50hp Power Cube work.