May Prep: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
 
(12 intermediate revisions by the same user not shown)
Line 1: Line 1:
Preparing for Summer of Extreme Production - June 1 - Aug 31. Top priorities:
Preparing for Summer of Extreme Production - June 1 - Aug 31. Top priorities:


=Production=
=Workshops=
*Set date for MicroCube, Delta 3D Printer build, Sensor Construction Set, and Filament Extruder.


==Extreme Dev Protocols==
==Extreme Dev Protocols==
Line 18: Line 19:


==Infrastructure==
==Infrastructure==
#Design Sprints on [[Modular Summer Camp]]
#Generate Construction Set on Modular Structures - both framed and CEB masonry
#Simple Off-Grid Microhouses - get PV panels + Simple MH Design
#Simple Off-Grid Microhouses - get PV panels + Simple MH Design
#Update [[Tech Team Culturing Survey]] - with map and a new wiki page - to take advantage of weekly design sprints, integrated within Development Week.
#Update [[Tech Team Culturing Survey]] - with map and a new wiki page - to take advantage of weekly design sprints, integrated within Development Week.
Line 39: Line 40:


=Tasks=
=Tasks=
==General==
==Infrastructure Buildout==
#Last ad push -
#Get van
#Caution map,for dozer work
#Confirm MREA
#Finalize all DPVs
#Get Mixer working
#Get new CEB controller
#Build next brick press
#Prepare modular buildout strategy
#Last ad push for DPVs
#Court and payment - thu a holiday. .
#Court and payment - thu a holiday. .
#Taxes + other legal docs;
#pay import + WA tax
#pay import + WA tax
#Solar panels buy
#Solar panels buy
#Get van
#Campground design - hypermodular design
#Campground design - stackable stalls
#Admin assistant
#Respond to DPVs
#Admin
#Crowd source Brick Press Instructional
#Crowd source Brick Press Instructional
#General workshop feedback form
#General workshop feedback form
#Milwaukee tickets refund
#Milwaukee tickets refund
#Cash all checks
#Liability followup
#Get tablets
#Get tablets
#Get some computers
#Get some computers
#Prep for dozing
#Prep for dozing - take down one structure, map for Dozer
#Propane tank
#Propane tank - HabLab, 1000 gal.
#2-3 internet lines in HabLab  
#Microhouse propane tank - fill
#3 internet lines in HabLab  
#24 seating in Hablab
#24 seating in Hablab
#Install mailbox
#Install septic tank
==Organization==
#Liability waiver followup
#OSE filing due May 15
#Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)
#Send out donation receipts
#Set up OSE paypal.
#Set up OSE paypal.
#Get mailbox
#Deposit checks
#Change PayPal address to MO
#Move forward on Solar Panels - buy more, get refund as well
#''Too Many Questions Management Strategy''
#CPR and First Aid Training


==Organization==
==Today==
*OSE filing due May 15
*Call about tax filing
*Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)
*Mail extension letter (lunch time)
*Send out donation receipts
*Locate pool
*Transfer PayPal to new bank account
*6 PM CPR/first aid
*Deposit checks
 
*
=Culture=
*[[OSE Open Culture]]
*[[OSE Contributor Map]] - put yourself on the map, and state your contributions upon mouseover. Open editing for people to update their entries.

Latest revision as of 13:41, 2 June 2014

Preparing for Summer of Extreme Production - June 1 - Aug 31. Top priorities:

Workshops

  • Set date for MicroCube, Delta 3D Printer build, Sensor Construction Set, and Filament Extruder.

Extreme Dev Protocols

  • Seed main site with OSE Collaboration Architecture
  • Extreme Onboarding
  • Do workshop collaborator survey - to attract developers
    • robot arm, quad delta, micro power cube
  • Update Contributor Log to a pulldown of machines and modules
  • Instructional on FreeCAD + Media going to Dozuki Guides
    1. Explainer on Development Boards. Development Board Script. Development Board Manual Page.
  • Visit China to integrate Extreme Learning
  • CAD Systems Tutorial - how to go from any file format to another
  • Stabilize video editing infrastructure. Determine video quality and upload standards.
  • Stabilize image upload infrastructure
  • Improve Team Membership. Every project should have a form collecting names of developers, so everyone can communicate with one another. People can edit the responses to remove their info if they are no longer interested. Keeps list management on Contributor side - allowing self-management - and takes responsibility off group organizer (good design)

Infrastructure

  1. Generate Construction Set on Modular Structures - both framed and CEB masonry
  2. Simple Off-Grid Microhouses - get PV panels + Simple MH Design
  3. Update Tech Team Culturing Survey - with map and a new wiki page - to take advantage of weekly design sprints, integrated within Development Week.
  4. Add more bandwidth to Factor e Farm

CEB

  • MREA contract - 2 presses
  • Shake down Pulverizer

Tractor

CNC Torch

  • Organize design sprint every other day
  • Organize tech review:
  • Alignment Procedure
  • Gear rack meshing procedure and troubleshooting
  • Gas flow control
  • Z axis

Tasks

Infrastructure Buildout

  1. Get van
  2. Confirm MREA
  3. Finalize all DPVs
  4. Get Mixer working
  5. Get new CEB controller
  6. Build next brick press
  7. Prepare modular buildout strategy
  8. Last ad push for DPVs
  9. Court and payment - thu a holiday. .
  10. pay import + WA tax
  11. Solar panels buy
  12. Campground design - hypermodular design
  13. Admin assistant
  14. Crowd source Brick Press Instructional
  15. General workshop feedback form
  16. Milwaukee tickets refund
  17. Get tablets
  18. Get some computers
  19. Prep for dozing - take down one structure, map for Dozer
  20. Propane tank - HabLab, 1000 gal.
  21. Microhouse propane tank - fill
  22. 3 internet lines in HabLab
  23. 24 seating in Hablab
  24. Install mailbox
  25. Install septic tank

Organization

  1. Liability waiver followup
  2. OSE filing due May 15
  3. Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)
  4. Send out donation receipts
  5. Set up OSE paypal.
  6. Deposit checks
  7. Change PayPal address to MO
  8. Move forward on Solar Panels - buy more, get refund as well
  9. Too Many Questions Management Strategy
  10. CPR and First Aid Training

Today

  • Call about tax filing
  • Mail extension letter (lunch time)
  • Locate pool
  • 6 PM CPR/first aid

Culture