==Thur. 7 Aug. 2014==
*Started work on dozuki microhouse 3 wall modules [http://opensourceecology.dozuki.com/Guide/Module+3a%2Bb/158]
==Thur. 5 Jun. 2014==
*Uploaded [[File:CEBPressSolenoidAssembly.skp]]
*Uploaded uncorrupted [[File:CEB Press 6 Fabrication Drawings.zip]]
*Got dimensions of Solenoid Assembly Hydraulic connections for updating of CAD models [https://opensourceecology.trovebox.com/photos/album-15/token-40e2e0b983/list see photos of actual assembly]
*Created schematic of Solenoid Assembly with Hydraulic Connectors in [https://docs.google.com/presentation/d/1SUUtXan2g-ZltK5WlgeAXnqHiHaWgqLzG8JlQRqrjkc/edit#slide=id.g1d984a886_017 google presentation]
*Created [[Lasersaur_Exterior_Panel_Installation]] to document current status of Lasersaur exterior panel installation
*Helped Organize workshop
*Disassembled solenoid valve assembly and began cleaning/degreasing components in preparation for reassembly
==Wed. 4 Jun. 2014==
*Started documenting [https://docs.google.com/presentation/d/1SUUtXan2g-ZltK5WlgeAXnqHiHaWgqLzG8JlQRqrjkc/edit#slide=id.g1db0c2aca_4029 CEB 6 Solenoid Assembly Manual]
*Uploaded [[File:SolenoidAssembly.FCStd]]
*Removed Solenoid Assembly from old Brick Press for updating FreeCAD model & for cleaning/degunking
*Reassembled CEB Press with a team [[https://opensourceecology.trovebox.com/p/4kq?sortBy=dateUploaded,desc CEB Press]]
==Tues. 3 Jun 2014==
*Documented problems encountered during [http://opensourceecology.org/wiki/Lasersaur_Exterior_Panel_Installation Lasersaur Exterior Panel Installation]
*Started Workshop reorganize and fixed some power tool plugs and extension cord ends.
*Worked with a team to reassemble the CEB Press.  Learned it is important to have a CAD model that matches the actual model.  Also good to replace nuts and washers onto corresponding bolts while disassembling in order to simplify reassembly.
==Mon. 2 Jun 2014==
==Mon. 2 Jun 2014==
*Sketchup practice
*Sketchup practice
*[[CEB Press 6 - Drawer Guides - Build Instructions]]
*[[CEB Press 6 - Drawer Guides - Build Instructions]]
*Started Mounting Lasersaur CNC Laser Cover Plates: need to drill additional holes as per Lasersaur Manual  
*Started Mounting Lasersaur CNC Laser Cover Plates: need to drill additional holes as per Lasersaur Manual  
*Edited Lasersaur CAD model to include dimensions and location of panel holes [[LasersaurTopPanels.ogg]][[LasersaurTopDoorPanels.ogg]][[LasersaurFrontDoorPanels.ogg]][[LasersaurRightSidePanel.ogg]][[LasersaurLeftSidePanel.ogg]]
*Edited Lasersaur CAD model to include dimensions and location of panel holes [http://opensourceecology.org/wiki/File:LasersaurTopPanels.jpg],[http://opensourceecology.org/wiki/File:LasersaurTopDoorPanels.jpg],[http://opensourceecology.org/wiki/File:LasersaurFrontDoorPanels.jpg],[http://opensourceecology.org/wiki/File:LasersaurRightSidePanel.jpg],[http://opensourceecology.org/wiki/File:LasersaurLeftSidePanel.jpg],[http://opensourceecology.org/wiki/File:LasersaurFrontPanels.jpg]


==Sat. 31 May 2014==
==Sat. 31 May 2014==
*Finalized prep for OSE
*Finalized prep for OSE
*Installed software recommended in DPV Offer Letter
*Installed software recommended in DPV Offer Letter
[[Category:Logs]]

Latest revision as of 01:24, 24 January 2016

Thur. 7 Aug. 2014

  • Started work on dozuki microhouse 3 wall modules [1]


Thur. 5 Jun. 2014


Wed. 4 Jun. 2014

Tues. 3 Jun 2014

  • Documented problems encountered during Lasersaur Exterior Panel Installation
  • Started Workshop reorganize and fixed some power tool plugs and extension cord ends.
  • Worked with a team to reassemble the CEB Press. Learned it is important to have a CAD model that matches the actual model. Also good to replace nuts and washers onto corresponding bolts while disassembling in order to simplify reassembly.

Mon. 2 Jun 2014

Sat. 31 May 2014

  • Finalized prep for OSE
  • Installed software recommended in DPV Offer Letter