Cris Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
(7 intermediate revisions by one other user not shown)
Line 1: Line 1:
==Thur. 7 Aug. 2014==
*Started work on dozuki microhouse 3 wall modules [http://opensourceecology.dozuki.com/Guide/Module+3a%2Bb/158]
==Thur. 5 Jun. 2014==
*Uploaded [[File:CEBPressSolenoidAssembly.skp]]
*Uploaded uncorrupted [[File:CEB Press 6 Fabrication Drawings.zip]]
*Got dimensions of Solenoid Assembly Hydraulic connections for updating of CAD models [https://opensourceecology.trovebox.com/photos/album-15/token-40e2e0b983/list see photos of actual assembly]
*Created schematic of Solenoid Assembly with Hydraulic Connectors in [https://docs.google.com/presentation/d/1SUUtXan2g-ZltK5WlgeAXnqHiHaWgqLzG8JlQRqrjkc/edit#slide=id.g1d984a886_017 google presentation]
*Created [[Lasersaur_Exterior_Panel_Installation]] to document current status of Lasersaur exterior panel installation
*Helped Organize workshop
*Disassembled solenoid valve assembly and began cleaning/degreasing components in preparation for reassembly
==Wed. 4 Jun. 2014==
==Wed. 4 Jun. 2014==
*Started documenting [https://docs.google.com/presentation/d/1SUUtXan2g-ZltK5WlgeAXnqHiHaWgqLzG8JlQRqrjkc/edit#slide=id.g1db0c2aca_4029 CEB 6 Solenoid Assembly Manual]
*Started documenting [https://docs.google.com/presentation/d/1SUUtXan2g-ZltK5WlgeAXnqHiHaWgqLzG8JlQRqrjkc/edit#slide=id.g1db0c2aca_4029 CEB 6 Solenoid Assembly Manual]
*Uploaded [[File:SolenoidAssembly.FCStd]]
*Uploaded [[File:SolenoidAssembly.FCStd]]
*Removed Solenoid Assembly from old Brick Press for updating FreeCAD model & for cleaning/degunking
*Reassembled CEB Press with a team [[https://opensourceecology.trovebox.com/p/4kq?sortBy=dateUploaded,desc CEB Press]]


==Tues. 3 Jun 2014==
==Tues. 3 Jun 2014==
Line 17: Line 33:
*Finalized prep for OSE
*Finalized prep for OSE
*Installed software recommended in DPV Offer Letter
*Installed software recommended in DPV Offer Letter
[[Category:Logs]]

Latest revision as of 01:24, 24 January 2016

Thur. 7 Aug. 2014

  • Started work on dozuki microhouse 3 wall modules [1]


Thur. 5 Jun. 2014


Wed. 4 Jun. 2014

Tues. 3 Jun 2014

  • Documented problems encountered during Lasersaur Exterior Panel Installation
  • Started Workshop reorganize and fixed some power tool plugs and extension cord ends.
  • Worked with a team to reassemble the CEB Press. Learned it is important to have a CAD model that matches the actual model. Also good to replace nuts and washers onto corresponding bolts while disassembling in order to simplify reassembly.

Mon. 2 Jun 2014

Sat. 31 May 2014

  • Finalized prep for OSE
  • Installed software recommended in DPV Offer Letter