*$1 for unstabilized, $1.20 for stabilized - [http://www.midwestearthbuilders.com/BuildingInfo.html]
*$1 for unstabilized, $1.20 for stabilized - [http://www.midwestearthbuilders.com/BuildingInfo.html]


=OSE Costs=
=Proejcted OSE Costs - Expected to be Attained at [[Summer X]] 2021=
{{Hint|One scenario missing is soil digging, which adds 1.5 gallon per hour cost of fuel to the overall operation.}}
{{Hint|Absolute production cost ranges from 5 to 40 cents per block under the assumptions below. Note - soil digging is not included, which adds 1.5 gallon per hour cost of fuel to the overall operation.}}
*Costs based on availability of on-site soil
*Costs based on availability of on-site soil
*6 block per minute machine - 8 hour shift - 1 gallon per hour for CEB, 0.5 gallon per hour for tractor (25% duty cycle assuming nearby pile of soil that has already been dug), one gallon per hour for soil mixer, local clay soil, 10% cement stabilized
*6 block per minute machine - 8 hour shift - 1 gallon per hour for CEB, 0.5 gallon per hour for tractor (25% duty cycle assuming nearby pile of soil that has already been dug), one gallon per hour for soil mixer, local clay soil, '''10%''' cement stabilized
*Total costs for 2880 block:
*Total costs for 2880 block:
#2.5 gal* 8=20 gal fuel = $50 at current gas prices
#2.5 gal* 8=20 gal fuel = $50 at current gas prices
Line 17: Line 17:


<html>
<html>
<iframe width="600" height="371" seamless frameborder="0" scrolling="no" src="https://docs.google.com/spreadsheets/d/e/2PACX-1vRnJwyI4Vf5CGyX5Nih8E3BkQnqO5gp1vY5EfB1Da9MdSsG7qXFwX3ihnMlHAyl7QK3REbPMTnX-_3-/pubchart?oid=1503243164&amp;format=interactive"></iframe>


<iframe width="600" height="371" seamless frameborder="0" scrolling="no" src="https://docs.google.com/spreadsheets/d/e/2PACX-1vRnJwyI4Vf5CGyX5Nih8E3BkQnqO5gp1vY5EfB1Da9MdSsG7qXFwX3ihnMlHAyl7QK3REbPMTnX-_3-/pubchart?oid=932276818&amp;format=interactive"></iframe>
<iframe width="600" height="371" seamless frameborder="0" scrolling="no" src="https://docs.google.com/spreadsheets/d/e/2PACX-1vRnJwyI4Vf5CGyX5Nih8E3BkQnqO5gp1vY5EfB1Da9MdSsG7qXFwX3ihnMlHAyl7QK3REbPMTnX-_3-/pubchart?oid=932276818&amp;format=interactive"></iframe>
Line 34: Line 32:
=Upload of Key Costs=
=Upload of Key Costs=
[[File:CEBblockcost.jpg|200px]]
[[File:CEBblockcost.jpg|200px]]
=Links=
*[[Soil Preparation for CEB]]
*Aidan notes - [[Talk:Cost_of_CEB_Block]]

Latest revision as of 01:42, 30 April 2021

Commercial

  • $1 for unstabilized, $1.20 for stabilized - [1]

Proejcted OSE Costs - Expected to be Attained at Summer X 2021

HintLightbulb.png Hint: Absolute production cost ranges from 5 to 40 cents per block under the assumptions below. Note - soil digging is not included, which adds 1.5 gallon per hour cost of fuel to the overall operation.

  • Costs based on availability of on-site soil
  • 6 block per minute machine - 8 hour shift - 1 gallon per hour for CEB, 0.5 gallon per hour for tractor (25% duty cycle assuming nearby pile of soil that has already been dug), one gallon per hour for soil mixer, local clay soil, 10% cement stabilized
  • Total costs for 2880 block:
  1. 2.5 gal* 8=20 gal fuel = $50 at current gas prices
  2. Cement - $10 per bag for 100 block - 29 bags of cement - $290
  3. Labor - $25/hr for tractor operator, $15/hr for stacking block on pallets x2 - $440/day
  4. Water - 20 ml/block = 58 liters = 15 gallons at 2 cents - 30 cents in water
  5. Plastic wrap
  6. Pallets

Total costs -