Cost of CEB Block: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(6 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
*$1 for unstabilized, $1.20 for stabilized - [http://www.midwestearthbuilders.com/BuildingInfo.html] | *$1 for unstabilized, $1.20 for stabilized - [http://www.midwestearthbuilders.com/BuildingInfo.html] | ||
=OSE Costs= | =Proejcted OSE Costs - Expected to be Attained at [[Summer X]] 2021= | ||
{{Hint| | {{Hint|Absolute production cost ranges from 5 to 40 cents per block under the assumptions below. Note - soil digging is not included, which adds 1.5 gallon per hour cost of fuel to the overall operation.}} | ||
*Costs based on availability of on-site soil | *Costs based on availability of on-site soil | ||
*6 block per minute machine - 8 hour shift - 1 gallon per hour for CEB, 0.5 gallon per hour for tractor (25% duty cycle assuming nearby pile of soil that has already been dug), one gallon per hour for soil mixer, local clay soil, 10% cement stabilized | *6 block per minute machine - 8 hour shift - 1 gallon per hour for CEB, 0.5 gallon per hour for tractor (25% duty cycle assuming nearby pile of soil that has already been dug), one gallon per hour for soil mixer, local clay soil, '''10%''' cement stabilized | ||
*Total costs for 2880 block: | *Total costs for 2880 block: | ||
#2.5 gal* 8=20 gal fuel = $50 at current gas prices | #2.5 gal* 8=20 gal fuel = $50 at current gas prices | ||
Line 17: | Line 17: | ||
<html> | <html> | ||
<iframe width="600" height="371" seamless frameborder="0" scrolling="no" src="https://docs.google.com/spreadsheets/d/e/2PACX-1vRnJwyI4Vf5CGyX5Nih8E3BkQnqO5gp1vY5EfB1Da9MdSsG7qXFwX3ihnMlHAyl7QK3REbPMTnX-_3-/pubchart?oid=932276818&format=interactive"></iframe> | <iframe width="600" height="371" seamless frameborder="0" scrolling="no" src="https://docs.google.com/spreadsheets/d/e/2PACX-1vRnJwyI4Vf5CGyX5Nih8E3BkQnqO5gp1vY5EfB1Da9MdSsG7qXFwX3ihnMlHAyl7QK3REbPMTnX-_3-/pubchart?oid=932276818&format=interactive"></iframe> | ||
Line 34: | Line 32: | ||
=Upload of Key Costs= | =Upload of Key Costs= | ||
[[File:CEBblockcost.jpg|200px]] | [[File:CEBblockcost.jpg|200px]] | ||
=Links= | |||
*[[Soil Preparation for CEB]] | |||
*Aidan notes - [[Talk:Cost_of_CEB_Block]] |
Latest revision as of 01:42, 30 April 2021
Commercial
- $1 for unstabilized, $1.20 for stabilized - [1]
Proejcted OSE Costs - Expected to be Attained at Summer X 2021
Hint: Absolute production cost ranges from 5 to 40 cents per block under the assumptions below. Note - soil digging is not included, which adds 1.5 gallon per hour cost of fuel to the overall operation.
- Costs based on availability of on-site soil
- 6 block per minute machine - 8 hour shift - 1 gallon per hour for CEB, 0.5 gallon per hour for tractor (25% duty cycle assuming nearby pile of soil that has already been dug), one gallon per hour for soil mixer, local clay soil, 10% cement stabilized
- Total costs for 2880 block:
- 2.5 gal* 8=20 gal fuel = $50 at current gas prices
- Cement - $10 per bag for 100 block - 29 bags of cement - $290
- Labor - $25/hr for tractor operator, $15/hr for stacking block on pallets x2 - $440/day
- Water - 20 ml/block = 58 liters = 15 gallons at 2 cents - 30 cents in water
- Plastic wrap
- Pallets
Total costs -