Full Build Certification: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
|  (Created page with "#Grading land using open source heavy machines or equivalent. #Using and maintaining open source machines (tractor, backhoe, trencher, auger, cherrypicker, forks, power ladder...") | No edit summary | ||
| (3 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| #Using and maintaining open source machines (tractor, backhoe, trencher, auger, cherrypicker, forks, power ladder, stump grinder, mulcher, mower) including the ability to use all the implements safely. | #Using and maintaining open source machines (tractor, backhoe, trencher, auger, cherrypicker, forks, power ladder, stump grinder, mulcher, mower) including the ability to use all the implements safely. | ||
| #Using and maintaining [[Power Cubes]] and replacing them on a machine for zero downtime. | #Using and maintaining [[Power Cubes]] and replacing them on a machine for zero downtime. | ||
| #Site evaluation, site soil testing, site surveying, and site GIS. Surveying and GIS training at collaborating community college. | #Site evaluation, site soil testing, site surveying, site aerial mapping, and site GIS. Surveying and GIS training at collaborating community college. | ||
| #PV system installation | #Site grading with skid steering machine, and site excavation. | ||
| #Foundation marking and squaring. | |||
| #Foundation forms installation | |||
| #Foundation posthole augering | |||
| #Pre-foundation rough plumbing installation | |||
| #Concrete work including screeing, floating, troweling, and power trowelling. | |||
| #Installation of a frost protected footer. | |||
| #Sill plate installation | |||
| #Rough concrete polishing to 400 grit | |||
| #Exterior wall framing | |||
| #Exterior Door framing | |||
| #Exterior Window framing | |||
| #Exterior wall installation including doors and windows | |||
| #Top plate installation | |||
| #Floor joists installation | |||
| #Roof installation - main roof box | |||
| #Roof installation - rigig foam roof box | |||
| #EPDM installation on roof | |||
| #Door installation | |||
| #Interior door installation | |||
| #Door knob installation | |||
| #Deck framing and sheathing | |||
| #Deck installation | |||
| #House wrap installation | |||
| #Vinyl siding installation | |||
| #Trim installation | |||
| #Deck EPDM installation | |||
| #Gutter installation, roof and deck | |||
| #Foundation skirt installation including plants | |||
| #Final landscaping with sod and tree plantings | |||
| #Rough interior framing  | |||
| #Bath tub installation (includes water extension) | |||
| #Stairway and landing installation | |||
| #Water supply manifold installation | |||
| #Rough plumbing installation | |||
| #Utility channel around doors | |||
| #Rough framing installation | |||
| #fiberglass insulation of roof and walls | |||
| #Beadboard installation | |||
| #Spray painting of interior | |||
| #Electrical service box installation | |||
| #Rough electrical wiring | |||
| #Outlets, switches, shutoffs, 3 way light switch, and lights installation | |||
| #Toilet installation | |||
| #Sinks installation | |||
| #Kitchen cabinet finishing and installation | |||
| #Washer installation | |||
| #Dishwasher installation | |||
| #Water heater installation | |||
| #Finish floor installation | |||
| #Interior trim installation | |||
| #Heat pump installation  | |||
| #PV system installation - structure and panels | |||
| #PV system installation - balance of system components and wiring | |||
| #Power Trailer maintanance and usage for onsite temporary power | #Power Trailer maintanance and usage for onsite temporary power | ||
| This is divided into base rate of $25, and $1 for every additional certification. | |||
Latest revision as of 19:39, 24 July 2022
- Grading land using open source heavy machines or equivalent.
- Using and maintaining open source machines (tractor, backhoe, trencher, auger, cherrypicker, forks, power ladder, stump grinder, mulcher, mower) including the ability to use all the implements safely.
- Using and maintaining Power Cubes and replacing them on a machine for zero downtime.
- Site evaluation, site soil testing, site surveying, site aerial mapping, and site GIS. Surveying and GIS training at collaborating community college.
- Site grading with skid steering machine, and site excavation.
- Foundation marking and squaring.
- Foundation forms installation
- Foundation posthole augering
- Pre-foundation rough plumbing installation
- Concrete work including screeing, floating, troweling, and power trowelling.
- Installation of a frost protected footer.
- Sill plate installation
- Rough concrete polishing to 400 grit
- Exterior wall framing
- Exterior Door framing
- Exterior Window framing
- Exterior wall installation including doors and windows
- Top plate installation
- Floor joists installation
- Roof installation - main roof box
- Roof installation - rigig foam roof box
- EPDM installation on roof
- Door installation
- Interior door installation
- Door knob installation
- Deck framing and sheathing
- Deck installation
- House wrap installation
- Vinyl siding installation
- Trim installation
- Deck EPDM installation
- Gutter installation, roof and deck
- Foundation skirt installation including plants
- Final landscaping with sod and tree plantings
- Rough interior framing
- Bath tub installation (includes water extension)
- Stairway and landing installation
- Water supply manifold installation
- Rough plumbing installation
- Utility channel around doors
- Rough framing installation
- fiberglass insulation of roof and walls
- Beadboard installation
- Spray painting of interior
- Electrical service box installation
- Rough electrical wiring
- Outlets, switches, shutoffs, 3 way light switch, and lights installation
- Toilet installation
- Sinks installation
- Kitchen cabinet finishing and installation
- Washer installation
- Dishwasher installation
- Water heater installation
- Finish floor installation
- Interior trim installation
- Heat pump installation
- PV system installation - structure and panels
- PV system installation - balance of system components and wiring
- Power Trailer maintanance and usage for onsite temporary power
This is divided into base rate of $25, and $1 for every additional certification.