SEH in 5 Trailer Loads: Difference between revisions
Jump to navigation
Jump to search
(Created page with "#Foundation #Floor 1 + subfloor + garage #Floor 2 + roof + House wrap #Interior framing with MEP and Tubs + doors + exterior trim + siding") |
(Added a Category to the Page) |
||
(4 intermediate revisions by one other user not shown) | |||
Line 1: | Line 1: | ||
=Loads= | |||
#Foundation | #Foundation | ||
#Floor 1 + subfloor + garage | #Floor 1 + subfloor + garage | ||
#Floor 2 + roof + House wrap | #Floor 2 + roof + PV + House wrap | ||
#Interior framing with MEP and Tubs + doors + exterior trim + siding | #Interior framing with MEP and Tubs + doors + exterior trim + siding | ||
#Insulation + beadboard + flooring + interior trim | |||
#Landscaping, waste, water, electrical connection. | |||
=Narrative= | |||
Get inverter and solar up as soon as possible so that we have power. For the 240V input, use a 240V feed from a small inverter or use small gen with [[120-240 Transformer]] | |||
[[Category: Logistics]] [[Category: Seed Eco-Home]] |
Latest revision as of 22:56, 7 June 2023
Loads
- Foundation
- Floor 1 + subfloor + garage
- Floor 2 + roof + PV + House wrap
- Interior framing with MEP and Tubs + doors + exterior trim + siding
- Insulation + beadboard + flooring + interior trim
- Landscaping, waste, water, electrical connection.
Narrative
Get inverter and solar up as soon as possible so that we have power. For the 240V input, use a 240V feed from a small inverter or use small gen with 120-240 Transformer