Solar Fire at Factor e Farm: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Category:Solar Fire Category:Solar Concentrator") |
Andrew Buck (talk | contribs) m (fixing redlink) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
=Project Plan for Solar Fire= | |||
#Produce full CAD documentation for the [[Solar Fire]] collector - June | |||
#Produce detailed fabrication procedure and BOM for Solar Fire - July | |||
#Factor e Team - shake down sourcing, prototype mirror assembly, and build foundation for solar concentrator - August | |||
#Eerik - organize automation team (Pivotal project tracking) for solar tracking mechanism | |||
#Produce [[steam engine]] with [[User:Mjn|Mark Norton]] (by end of July for testing) | |||
[[Category:Solar Fire]] | [[Category:Solar Fire]] | ||
[[Category:Solar Concentrator]] | [[Category:Solar Concentrator]] |
Latest revision as of 02:18, 3 June 2011
Project Plan for Solar Fire
- Produce full CAD documentation for the Solar Fire collector - June
- Produce detailed fabrication procedure and BOM for Solar Fire - July
- Factor e Team - shake down sourcing, prototype mirror assembly, and build foundation for solar concentrator - August
- Eerik - organize automation team (Pivotal project tracking) for solar tracking mechanism
- Produce steam engine with Mark Norton (by end of July for testing)