Minimum Workable Feature of XM Process Design: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(9 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
All development exists on component level | |||
3 Roles for Team: | |||
*Scrum Master is Team Host and Gopher | |||
*Product Owner is vision | |||
*Team does the work | |||
See [[Scrum Master Standard]] | |||
=Begin= | |||
=Rad= | |||
#Buy or get donated an industry standard machines | |||
#Definition of Ready | #Definition of Ready | ||
#Set up [[Scrumy]] project | #Set up [[Scrumy]] project | ||
Line 4: | Line 19: | ||
#Daily development log | #Daily development log | ||
#Daily Vlog | #Daily Vlog | ||
#Specification and design rationale | |||
#Conceptual design diagram | |||
#Machine functional process diagram | |||
#CAD | #CAD | ||
#CAM | #Fabrication Drawings | ||
#Fabrication Review | |||
#Tooling requirements defined | |||
#BOM | |||
#Sourcing information | |||
#Master Fabrication PDF | |||
#CAM files | |||
#CAE | #CAE | ||
#RP | #RP - rapid prototyping | ||
#Bench Prototype | |||
#SEBD | #SEBD | ||
#Control Code | |||
#Code | |||
#Circuit Diagram | |||
#Exploded Part Diagram | |||
#Test procedure defined | |||
#Test procedure performed | |||
#Daily Vlog | |||
#Daily Log | |||
#Scaling Calculations | |||
#Working prototype | #Working prototype | ||
#Budget | #Budget | ||
Line 15: | Line 49: | ||
#Recruit SME designer | #Recruit SME designer | ||
#Recruit SME prototyper | #Recruit SME prototyper | ||
#Integration into machine | |||
#SME [[XM Proposal Brief]] from developer | |||
#Video footage of build | |||
=Strategic Review= | |||
#Sourcing strategy | |||
#Sourcing review | |||
#BOM review | |||
#DfF (Design for Fabrication) review | |||
#Fabrication review | |||
#Video documentation strategy | |||
#Product ecology review | |||
#Team strategy | |||
#Team review - who should be on the team? | |||
#Integration logistics defined | |||
#Modularity Review | |||
#Lean review - process | |||
=Integration= | |||
#Fabrication optimization strategy defined and documented | |||
#Cnx.org upgrade | |||
#Integration into machine | |||
#Regression testing (integrated machine testing) | |||
#Product ecology testing (test with other machines) | |||
#Pairing of team members | |||
#Cross training | |||
#Video editing | |||
]] | ]] |
Latest revision as of 21:59, 13 March 2012
All development exists on component level
3 Roles for Team:
- Scrum Master is Team Host and Gopher
- Product Owner is vision
- Team does the work
Begin
Rad
- Buy or get donated an industry standard machines
- Definition of Ready
- Set up Scrumy project
- Set up XM Project Page
- Daily development log
- Daily Vlog
- Specification and design rationale
- Conceptual design diagram
- Machine functional process diagram
- CAD
- Fabrication Drawings
- Fabrication Review
- Tooling requirements defined
- BOM
- Sourcing information
- Master Fabrication PDF
- CAM files
- CAE
- RP - rapid prototyping
- Bench Prototype
- SEBD
- Control Code
- Code
- Circuit Diagram
- Exploded Part Diagram
- Test procedure defined
- Test procedure performed
- Daily Vlog
- Daily Log
- Scaling Calculations
- Working prototype
- Budget
- Contract First Manufacturing (Interface Design)
- Rapid Prototype done via RP Strategy
- Recruit SME designer
- Recruit SME prototyper
- Integration into machine
- SME XM Proposal Brief from developer
- Video footage of build
Strategic Review
- Sourcing strategy
- Sourcing review
- BOM review
- DfF (Design for Fabrication) review
- Fabrication review
- Video documentation strategy
- Product ecology review
- Team strategy
- Team review - who should be on the team?
- Integration logistics defined
- Modularity Review
- Lean review - process
Integration
- Fabrication optimization strategy defined and documented
- Cnx.org upgrade
- Integration into machine
- Regression testing (integrated machine testing)
- Product ecology testing (test with other machines)
- Pairing of team members
- Cross training
- Video editing
]]