Minimum Workable Feature of XM Process Design: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(6 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
All development exists on component level | All development exists on component level | ||
3 Roles for Team: | |||
*Scrum Master is Team Host and Gopher | |||
*Product Owner is vision | |||
*Team does the work | |||
See [[Scrum Master Standard]] | |||
=Begin= | |||
=Rad= | |||
#Buy or get donated an industry standard machines | |||
#Definition of Ready | #Definition of Ready | ||
Line 18: | Line 31: | ||
#CAM files | #CAM files | ||
#CAE | #CAE | ||
#RP - rapid prototyping | |||
#RP | |||
#Bench Prototype | #Bench Prototype | ||
#SEBD | #SEBD | ||
Line 39: | Line 51: | ||
#Integration into machine | #Integration into machine | ||
#SME [[XM Proposal Brief]] from developer | #SME [[XM Proposal Brief]] from developer | ||
#Video footage of build | |||
=Strategic Review= | |||
#Sourcing strategy | |||
#Sourcing review | |||
#BOM review | |||
#DfF (Design for Fabrication) review | |||
#Fabrication review | |||
#Video documentation strategy | |||
#Product ecology review | |||
#Team strategy | |||
#Team review - who should be on the team? | |||
#Integration logistics defined | |||
#Modularity Review | |||
#Lean review - process | |||
Integration | =Integration= | ||
#Fabrication optimization | #Fabrication optimization strategy defined and documented | ||
#Cnx.org upgrade | #Cnx.org upgrade | ||
#Integration into machine | #Integration into machine | ||
#Regression testing (integrated machine testing) | #Regression testing (integrated machine testing) | ||
#Product ecology testing (test with other machines) | #Product ecology testing (test with other machines) | ||
#Pairing of team members | |||
#Cross training | |||
#Video editing | |||
]] | ]] |
Latest revision as of 21:59, 13 March 2012
All development exists on component level
3 Roles for Team:
- Scrum Master is Team Host and Gopher
- Product Owner is vision
- Team does the work
Begin
Rad
- Buy or get donated an industry standard machines
- Definition of Ready
- Set up Scrumy project
- Set up XM Project Page
- Daily development log
- Daily Vlog
- Specification and design rationale
- Conceptual design diagram
- Machine functional process diagram
- CAD
- Fabrication Drawings
- Fabrication Review
- Tooling requirements defined
- BOM
- Sourcing information
- Master Fabrication PDF
- CAM files
- CAE
- RP - rapid prototyping
- Bench Prototype
- SEBD
- Control Code
- Code
- Circuit Diagram
- Exploded Part Diagram
- Test procedure defined
- Test procedure performed
- Daily Vlog
- Daily Log
- Scaling Calculations
- Working prototype
- Budget
- Contract First Manufacturing (Interface Design)
- Rapid Prototype done via RP Strategy
- Recruit SME designer
- Recruit SME prototyper
- Integration into machine
- SME XM Proposal Brief from developer
- Video footage of build
Strategic Review
- Sourcing strategy
- Sourcing review
- BOM review
- DfF (Design for Fabrication) review
- Fabrication review
- Video documentation strategy
- Product ecology review
- Team strategy
- Team review - who should be on the team?
- Integration logistics defined
- Modularity Review
- Lean review - process
Integration
- Fabrication optimization strategy defined and documented
- Cnx.org upgrade
- Integration into machine
- Regression testing (integrated machine testing)
- Product ecology testing (test with other machines)
- Pairing of team members
- Cross training
- Video editing
]]