Rob Beddingfield Log: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 2: | Line 2: | ||
[[File:CEB5.step]] | [[File:CEB5.step]] | ||
[[File:CEB5. | [[File:CEB5 drawer.stp]] | ||
[[File:CEB5 main frame.stp]] | |||
=Thu Aug 8, 2013= | =Thu Aug 8, 2013= |
Revision as of 16:42, 10 August 2013
Thu Aug 10, 2013
Thu Aug 8, 2013
- MADE 3D MODEL - CAM CLAMP ASSY
- HAVE QUESTIONS ABOUT SENSOR CLAMPS
- HAVE QUESTIONS ABOUT VALVE MOUNTING CLAMPS
- NEED PICTURES OF ALL THREE INCLUDING CAM CLAMPS
TUE, 6 Aug
- CEB V SOIL SHAKER 3D MODEL
MON, 5 Aug
- CEB V Hopper Supports 3d model
SAT, 4 Aug
- CEB V Arm assemblies 3d model
THU, 1 Aug
- CEB V drawer
Wed, 30 Jul
- CEB V frame - modified model for frame to reflect cnc cut parts.
- Finished core assembly, drawer assembly next
Mon, 29 Jul
- CEB V frame - modified model for frame to reflect cnc cut parts.
- still need to assemble top flange assembly
- Christmas_Gift_to_the_World