CEB Press Workshop 2016 Working Page: Difference between revisions
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
=Cut List= | =Cut List= | ||
6 Abrasive Cutoff Saws | |||
*[20] 2.5" square tube sleeves - 6" long | |||
*[4] Hinges - 30" sections | *[4] Hinges - 30" sections | ||
*[ | *[2] Hopper Supports - 2" tube - 2.5' long | ||
*[4] Legs | *[2] Hopper Supports - 2" tube - 3' long | ||
*[4] Legs - 2" tube - | |||
*[31] slats - 24" long | *[31] slats - 24" long | ||
*[1] slat - 56" long | *[1] slat - 56" long |
Revision as of 11:33, 23 September 2016
X for extreme manufacturing.
- FreeCAD file - File:CEBPressJuneGroup.fcstd
- CEB_Press_6#Instructional_Files - detailed instructions from 2014 build
- OSE Workshops FB Page - post all pictures there.
- Data - take any data notes here
Cut List
6 Abrasive Cutoff Saws
- [20] 2.5" square tube sleeves - 6" long
- [4] Hinges - 30" sections
- [2] Hopper Supports - 2" tube - 2.5' long
- [2] Hopper Supports - 2" tube - 3' long
- [4] Legs - 2" tube -
- [31] slats - 24" long
- [1] slat - 56" long
Shot List
Part - Assemdbly - Module
- parts before any work
- grinding slag from each piece
- grinding all edges
- painting
Hopper
- Label all parts
- take picture of ALL parts before any work. Includes bolts.
- grinding slag from each piece
- grind sharp corners
- painting
- Mark holes on hinges from hopper pattern
- Mag drill holes in hopper pieces