OSE Botswana: Difference between revisions
No edit summary |
m (Added a Category to the Page) |
||
Line 24: | Line 24: | ||
Bus in casual labourers to build infrastructure. | Bus in casual labourers to build infrastructure. | ||
Fly in MJ & CM for CEB build and other machines for workshop. | Fly in MJ & CM for CEB build and other machines for workshop. | ||
[[Category: OSE Botswana]] |
Latest revision as of 03:57, 13 November 2022
OSE Botswana Plan
Africa Budget, Africa Pilot, Citizen Entrepreneurial Development Agency (CEDA)[1], Local Enterprise Authority (LEA)[2] for funding.
Business Plan Draft
https://docs.google.com/document/d/1if8J_cMsjpGxNN9tUYF0azJIIjbIunTOBkUrExHRIXE/edit
Land Allocation
Approximately 92.8 hectares (229 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA) Sample certificate of one of the plots of land allocated to Makunga Family members: File:Certificate of Customary Land Grant.pdf
OSE Microfactory and Campus Botswana
Planning:
- need water - borehole?
- Power - Generator to power welders
- Foundation Slab - for workshop: 15m x 20m with roof.
- CEB press parts
- Toilets and showers
1st phase need workshop and CEB press to begin building infrastructure - staff housing, dorms & cabins. Need Site plan. CEB house plans, dorms and cabin plans. Bus in casual labourers to build infrastructure. Fly in MJ & CM for CEB build and other machines for workshop.