OSE Theory of Efficient Builds: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
This is nothing new, just building on elimination of muda, [[6 Sigma]], [[Test-Driven Design]], [[Second Toyota Paradox]], [[Visual Workshop]], and other techniques for | This is nothing new, just building on elimination of muda, [[6 Sigma]], [[Test-Driven Design]], [[Second Toyota Paradox]], [[Visual Workshop]], and other techniques for rapid builds. | ||
=It's all in the Prep= | =It's all in the Prep= | ||
Applied to housing - one can prepare for rapid builds with jigs, modular design, preassembly of modules, | Applied to housing - one can prepare for rapid builds with jigs, modular design, preassembly of modules, [[Integrated Design]] of modules, and [[Design for Preassembly]]. |
Revision as of 19:47, 3 August 2023
This is nothing new, just building on elimination of muda, 6 Sigma, Test-Driven Design, Second Toyota Paradox, Visual Workshop, and other techniques for rapid builds.
It's all in the Prep
Applied to housing - one can prepare for rapid builds with jigs, modular design, preassembly of modules, Integrated Design of modules, and Design for Preassembly.