*$5k more in PV for 12kW, but that is standard for 2000 sf version, so is not counted. | |||
*Off-grid autonomous with [[AWG]] ($2k) at 1 liter per hour and 500W kW solar requirement (25% duty factor) | |||
Power Wall of 1 kWhr for tools etc. | *Distiller for 3kW (6 gallons for the day) ($2k). | ||
*[[Heat Storage]] of 20 totes - $3k | |||
[[Compressed Air Storage]] backup. $2500 in cost for 1 hphr. This is equivalent to batteries, at lifetime design instead of throwaway. | *Hot water heat pump - extra $4000 [https://skipthewarehouse.com/sanco2-gs4-45hpc-heat-pump-water-heater-outdoor-only] at 20 gph capacity or Hot Water Heat Pump instead and 48kBTU (see [[Hot Water Heat Pump]] | ||
*No added cost - open source inverter, | |||
*Rainwater collection - 2000 gal. Utility house is an adjacent enclosure. | |||
*4 tote Biodigester waste processor with 1000 gal processing volume, for 4 people. -$2k | |||
*Shit frier backup - $2k. | |||
*Biodigester works with [[Shit Dehydrator]], and final product is greywater for the greywater garden. | |||
*Service contract for utilities (water, heat, power, waste) | |||
*Power Wall of 1 kWhr for tools etc, $2k. | |||
*[[Compressed Air Storage]] backup. $2500 in cost for 1 hphr. This is equivalent to batteries, at lifetime design instead of throwaway. | |||
*20kW Wind turbine - $5k | |||
* | |||
$15k extra for full autonomous option. With hydrogen - cost may be more. | $15k extra for full autonomous option. With hydrogen - cost may be more. | ||
=Other at extra cost= | |||
Hydrogen energy option from [https://www.enapter.com/aem-electrolysers/aem-electrolyser-el-4 Enapter] | *Includes water reclamation for closed-loop water cycle with sand filters, etc. | ||
*Hydrogen energy option from [https://www.enapter.com/aem-electrolysers/aem-electrolyser-el-4 Enapter] |
Revision as of 18:17, 3 December 2023
- $5k more in PV for 12kW, but that is standard for 2000 sf version, so is not counted.
- Off-grid autonomous with AWG ($2k) at 1 liter per hour and 500W kW solar requirement (25% duty factor)
- Distiller for 3kW (6 gallons for the day) ($2k).
- Heat Storage of 20 totes - $3k
- Hot water heat pump - extra $4000 [1] at 20 gph capacity or Hot Water Heat Pump instead and 48kBTU (see Hot Water Heat Pump
- No added cost - open source inverter,
- Rainwater collection - 2000 gal. Utility house is an adjacent enclosure.
- 4 tote Biodigester waste processor with 1000 gal processing volume, for 4 people. -$2k
- Shit frier backup - $2k.
- Biodigester works with Shit Dehydrator, and final product is greywater for the greywater garden.
- Service contract for utilities (water, heat, power, waste)
- Power Wall of 1 kWhr for tools etc, $2k.
- Compressed Air Storage backup. $2500 in cost for 1 hphr. This is equivalent to batteries, at lifetime design instead of throwaway.
- 20kW Wind turbine - $5k
$15k extra for full autonomous option. With hydrogen - cost may be more.
Other at extra cost
- Includes water reclamation for closed-loop water cycle with sand filters, etc.
- Hydrogen energy option from Enapter