* Lifeterac Motor Coupler Failure
* Lifeterac Motor Coupler Failure
<iframe width="420" height="315" src="https://www.youtube.com/embed//i4GjoFQ3zsg" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//i4GjoFQ3zsg" frameborder="0" allowfullscreen></iframe></html>


* Keywheel on Lifeterac snaps coupler
* Keywheel on Lifeterac snaps coupler
Line 19: Line 19:


* Welding Lifeterac Mufflers
* Welding Lifeterac Mufflers
<iframe width="420" height="315" src="https://www.youtube.com/embed//jPnKrAnEW88" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//jPnKrAnEW88" frameborder="0" allowfullscreen></iframe></html>






* Power Cube Wiring 2
* Power Cube Wiring 2
<iframe width="420" height="315" src="https://www.youtube.com/embed//KscQM0MevXE" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//KscQM0MevXE" frameborder="0" allowfullscreen></iframe></html>


* Instructions on connecting wiring
* Instructions on connecting wiring
Line 31: Line 31:


* Welding Remaining Mufflers
* Welding Remaining Mufflers
<iframe width="420" height="315" src="https://www.youtube.com/embed//3dldfw36B-I" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//3dldfw36B-I" frameborder="0" allowfullscreen></iframe></html>






* Oct 15 Update
* Oct 15 Update
<iframe width="420" height="315" src="https://www.youtube.com/embed//hmXBRe_zhXQ" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//hmXBRe_zhXQ" frameborder="0" allowfullscreen></iframe></html>


* Tractor issues: snapped couplers on wheel motors by forgetting to adjust pressure on main hydraulic line
* Tractor issues: snapped couplers on wheel motors by forgetting to adjust pressure on main hydraulic line
Line 44: Line 44:


* Pouring Panorama
* Pouring Panorama
<iframe width="420" height="315" src="https://www.youtube.com/embed//JC2s6F3v8yE" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//JC2s6F3v8yE" frameborder="0" allowfullscreen></iframe></html>


* A panorama view of the concrete pouring
* A panorama view of the concrete pouring
Line 52: Line 52:
=10/14/11=
=10/14/11=
* Moving Rebar to HabLab Site
* Moving Rebar to HabLab Site
<iframe width="420" height="315" src="https://www.youtube.com/embed//nNQ20gRrHns" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//nNQ20gRrHns" frameborder="0" allowfullscreen></iframe></html>


* Using OSE Tractor to move rebar to site
* Using OSE Tractor to move rebar to site
Line 59: Line 59:


* Floating
* Floating
<iframe width="420" height="315" src="https://www.youtube.com/embed//P9bm50ghdHc" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//P9bm50ghdHc" frameborder="0" allowfullscreen></iframe></html>






* Pour Sock
* Pour Sock
<iframe width="420" height="315" src="https://www.youtube.com/embed//CHdol5WWtuk" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//CHdol5WWtuk" frameborder="0" allowfullscreen></iframe></html>


*First slab flattened, pouring second
*First slab flattened, pouring second
Line 71: Line 71:


* Beginning to Pour
* Beginning to Pour
<iframe width="420" height="315" src="https://www.youtube.com/embed//xULhiNT9qzU" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//xULhiNT9qzU" frameborder="0" allowfullscreen></iframe></html>


* Pouring concrete for first slab
* Pouring concrete for first slab
Line 78: Line 78:


* 8 Cubic Yards
* 8 Cubic Yards
<iframe width="420" height="315" src="https://www.youtube.com/embed//YcwCEz3tu14" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//YcwCEz3tu14" frameborder="0" allowfullscreen></iframe></html>


* Pour of 8 cubic yards, 7.5 for slab
* Pour of 8 cubic yards, 7.5 for slab
Line 85: Line 85:


* Little Dry
* Little Dry
<iframe width="420" height="315" src="https://www.youtube.com/embed//frp9SLWQIlw" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//frp9SLWQIlw" frameborder="0" allowfullscreen></iframe></html>


* "Little dry so were adding 5 gallons of water"
* "Little dry so were adding 5 gallons of water"
Line 92: Line 92:


* Pour Panorama
* Pour Panorama
<iframe width="420" height="315" src="https://www.youtube.com/embed//uwem0DyHcqc" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//uwem0DyHcqc" frameborder="0" allowfullscreen></iframe></html>


* Pre-pour panorama of foundations
* Pre-pour panorama of foundations
Line 100: Line 100:


* Ready to pour HabLab foundations
* Ready to pour HabLab foundations
<iframe width="420" height="315" src="https://www.youtube.com/embed//Hg9RVcB-lKk" frameborder="0" allowfullscreen></iframe>
<html><iframe width="420" height="315" src="https://www.youtube.com/embed//Hg9RVcB-lKk" frameborder="0" allowfullscreen></iframe></html>
   
   
* Foundations for HabLab ready to pour
* Foundations for HabLab ready to pour

Revision as of 21:17, 16 October 2011

Archive

10/15/11

  • Power Cube Tabs Connecting to Tractor

  • Tab-mounting instructions for mounting Power Cube to the frame of Lifeterac


  • Lifeterac Motor Coupler Failure

  • Keywheel on Lifeterac snaps coupler
  • Remedy to have new couplers made by shop on Monday
  • Instructions on how to remove difficult wheelshafts and coupler


  • Welding Lifeterac Mufflers


  • Power Cube Wiring 2

  • Instructions on connecting wiring


  • Welding Remaining Mufflers


  • Oct 15 Update

  • Tractor issues: snapped couplers on wheel motors by forgetting to adjust pressure on main hydraulic line
  • Reducing from 3,000 PSI to half that, for safety


  • Pouring Panorama

  • A panorama view of the concrete pouring


10/14/11

  • Moving Rebar to HabLab Site

  • Using OSE Tractor to move rebar to site


  • Floating


  • Pour Sock

  • First slab flattened, pouring second


  • Beginning to Pour

  • Pouring concrete for first slab


  • 8 Cubic Yards

  • Pour of 8 cubic yards, 7.5 for slab


  • Little Dry

  • "Little dry so were adding 5 gallons of water"


  • Pour Panorama

  • Pre-pour panorama of foundations



  • Ready to pour HabLab foundations

  • Foundations for HabLab ready to pour
  • Overview of final foundation constructions

10/14/11

  • HabLab rebar and embodied energy


  • 10-man team pulls all-nighter to finish outside forms (average 6 people for 18 hours = 108 manhours)
  • view of completed layout with forms
  • retaining wall and forms completed and rebar layed
  • ready to pour concrete


10/13/11

  • Preparing the for HabLab Wall Foundations.


10/10/11

  • Construction Planning Meeting


10/09/11


10/07/11

  • Soil Pulverizer Prototype 3


  • Cost: 1215 in labor, 25h at 50 dollars/h + 750 in materials.
  • Pulverizes and loads the soil in 1 step!
  • This device replaces a stationary pulverizer plus a conveyor (both about 20000 dollars).



  • Documentation evolving
    • Upload immediately to youtube from an iPhone
    • People can access it and make instructionals, Ian Midgley will share how to do it.
    • The more material we have, the more material people can choose.
    • We write down the procedure in the Wiki
    • Howard Agnew writes the actual scripts remotely.




10/05/11

  • Ergonomic analysis of excavation - 500 sqm with foundation pads
    • For excavation 4000 dollars for 4 days of labor.
      • Day 1 - 4h bulldozing with CAT D7, 4h trackhoe.
      • Day 2 - 9,5h excavator (all 10 hours of labor), 3h skid loader
      • Day 3 - 11h excavator, 3h bulldozing, 6h skid steering with Bobcat
      • Day 4 - 1h excavator, 3h skid steer
      • Fuel: bulldozing 10gal/hour, excavator 4gal/hour, Bobcat 3gal/h
  • Baling and House construction ergonomics
    • Baling ergonomics: 3h for 100-200 bales. Issues with the length of bales.
    • House construction ergonomics - 3h to pour 40 pads, 7 cubic yards of concrete, 6 people working. 6x3 = 18 human hours.
    • Ergonomics of preparing the forms - 0.5h per pad, 40 pads = 20 hours. Leveling them off. So about 1h for each pad = 40h for all pads. Work: lay the form out, do the rebar, put the rebar in, dig out a little bit, put some gravel and leveling.
  • Cement truck arrives and pours cement in the Foundation pads.
    • Side comment: For the foundation pad construction: 20 minutes per pad, to put it in form and put in the metal. With 1-2 people.
  • Muffler design
    • Parts: steel pipe and insert with about 40 holes, 7 inches long, 6 inches on the inside, 1 inch from the base. With modular pipe fittings.



  • Baling day 1 summary
    • 3 bales/minute, 180/hour, about 1500/day. 1 bale is sold for 3 dollars = about 5000 dollars per day.

10/03/11


  • OSE Certification
    • Power Cube Producer - Tom Griffin from Texas, 1st replication, aiming for OSE Certification.
      • OSE provides Marketing assistance, publicize in our networks
      • He is contributing back to the community.
    • OSE License relates to the OSE Specifications, features the OSE products embody.
    • Certified people will comment and describe how their product meets each point of the OSE Specification. It will be transparent for the user if he gets a product from somebody else or us, so he know exactly what he is getting, particularly on a life-time design and modularity aspects of our equipment. The world benefits by knowing what they are getting into, and the certified producer benefits by the having access to our marketing channels.
    • OSE License is for building a distributing economics. It is not for us building an empire, but for us distributing as much productive power to everybody out there as possible.
      • To support the open sourcing of civilization, the producers would contribute a reasonable amount back to the OSE project, like 3%, we will have to decide on that, we don't want to overtax them, but a little kickback to the project to continue further open source development.
      • We will custom design these agreements, it will on a case by case basis.
    • With this OSE distributive economics license we focus on the fact that whoever is a producer is documenting the work completely, meaning the bills of materials and designs and they will pass our mark only when they are truly bringing about distributive economics for the whole world to benefit with. And that's a beautiful package that nobody can disagree with, that can get a lot of public support on many fronts.
    • That's about the OSE License, we will keep developing it, as people get on line to produce it we hope to have people actually funding the project through donations back to the commons in terms of developing further open source goods.



  • Message to Jason Fields from the Urban Farming Guys
    • Ian produced 7 minutes video for the entire procedure to build the frame of the LifeTrac.
    • Start writing the script and preparing your Kickstarter materials asap.
    • Create a simple jig and I am hoping that even you guys will complete the whole tractor frame within hours.



  • Dear True Fans and Supporters - Update
    • about 42 days of construction. Foundation will be poured tomorrow. Excavation is done. Right now we are doing haying for the hay bales.
    • Next week we will be full-time producing and laying CEB Bricks. SHonda is getting the CEB up. We go now to Sweiger to work on the Sawmill, hay cutter and pulverizers.
    • Kauffman Foundation may would have 103,000 dollars for us, but I would like to see this money across the table, there are a lot of technical difficulties there.
    • If we can show the straw bales and cut lumber from our own tree, that would be beautiful. We are finishing the Sawmill, we didn't get the blade till tonight, we will try to secure that.
    • By the end of this week we aim to have 3 Tractors with 6 Power Cubes so we can start construction.
    • Yoonseo Kang is coming this Thursday. And Ted Mosher anytime this week.
    • Revenue streams from non-profit, real production, investors, loans.



10/02/11

  • Hay conditioner 101 - International 1086 Tractor - about 130HP, Hesston hay conditioner (a rotary cutter), 1 steel and 1 rubber roll. In Action.


10/01/11

9/30/11

  • Column foundation forms - a laser level would be useful that sense out an array of lines across the whole field so that we don't have to mess with the water level.


9/28/11

HabLab
Excavation started
Gravel trucks and spreading
Excavation
Bulldozing


  • $60k construction grant is in