CEB instructionals to be transfered to Make Projects: Difference between revisions
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
=Transfer instructions= | =Transfer instructions= | ||
*Please transfer the Required tools and materials to the introduction. | *Please transfer the Required tools and materials to the introduction, as well as a link to the sketchup of the part. | ||
*Break the steps appropriately for the new guide. | *Break the steps appropriately for the new guide. | ||
*Images aren't necessary- I'll take care of them once we get the final sketchup version of the CEB and the 2D cad drawings. | *Images aren't necessary- I'll take care of them once we get the final sketchup version of the CEB and the 2D cad drawings. |
Revision as of 18:21, 14 December 2011
Transfer instructions
- Please transfer the Required tools and materials to the introduction, as well as a link to the sketchup of the part.
- Break the steps appropriately for the new guide.
- Images aren't necessary- I'll take care of them once we get the final sketchup version of the CEB and the 2D cad drawings.
- Please edit this page and place a check (
) next to the page when the text transfer is complete.
- When the images are all uploaded, I will move the link to the completed section.
Ready To Transfer
The following pages are ready to be transfered to make. Items which can be grouped into one make page are listed together. The text will not change:
- Make page titled "Support system": Leg Holders, Legs, Feet, Arms - secondary
- Hopper and grate supports: Grate Mounts, Hopper Supports
- Shaker motor mount-Can be broken into 3 guides: Motor mount
, Hammer and shaft (bolt shaft to coupler and hammer), and assembly