Power Cube VII: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
See [[Power Cube 6]] for latest Power Cube Documentation. [[Tom]] is currently building [[Power Cube VII]] - optimizing form factor for ergonomics. The power cube after that is Power Cube VIII. See [[Machine Naming Convention]]. | |||
=Date= | |||
*Slated for Sat Nov 9 - Sun Nov 10. | |||
*[[Tom Griffing]] is [[Guest Collaborative Production Run Director]] | |||
==Preparation== | |||
*Lathe up and running for spline coupler | |||
**Tom has a coupler jig | |||
*Lathe gearing via PowerCube + [[6 Spline PTO Motor]] | |||
=BOM= | |||
*How much of http://opensourceecology.org/wiki/Power_Cube_6/Bill_of_Materials is still accurate? | |||
=Fabrication Diagram= | |||
See [[Fabrication Diagram]] explanation. | |||
<html><img src="https://docs.google.com/drawings/pub?id=1KmkEsN6OPySaH11YeaQg51PJVuTzHqHMuWSajwRU8_4&w=900&h=500"></html> | |||
[https://docs.google.com/drawings/d/1KmkEsN6OPySaH11YeaQg51PJVuTzHqHMuWSajwRU8_4/edit edit] | |||
=Fabrication= | |||
Coupler - | |||
<html> <iframe width="300" height="169" src="https://www.youtube.com/embed//GDALEaHXt1g" frameborder="0" allowfullscreen></iframe> </html> |
Revision as of 16:17, 30 October 2012
See Power Cube 6 for latest Power Cube Documentation. Tom is currently building Power Cube VII - optimizing form factor for ergonomics. The power cube after that is Power Cube VIII. See Machine Naming Convention.
Date
- Slated for Sat Nov 9 - Sun Nov 10.
- Tom Griffing is Guest Collaborative Production Run Director
Preparation
- Lathe up and running for spline coupler
- Tom has a coupler jig
- Lathe gearing via PowerCube + 6 Spline PTO Motor
BOM
- How much of http://opensourceecology.org/wiki/Power_Cube_6/Bill_of_Materials is still accurate?
Fabrication Diagram
See Fabrication Diagram explanation.
Fabrication
Coupler -