Power Cube VIII Collaborative Production Run: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 25: | Line 25: | ||
Coupler - | Coupler - | ||
<html> <iframe width="300" height="169" src="https://www.youtube.com/embed//GDALEaHXt1g" frameborder="0" allowfullscreen></iframe> </html> | <html> <iframe width="300" height="169" src="https://www.youtube.com/embed//GDALEaHXt1g" frameborder="0" allowfullscreen></iframe> </html> | ||
[[category:Power Cube]] |
Latest revision as of 22:45, 27 December 2013
See Power Cube 6 for latest Power Cube Documentation. Tom is currently building Power Cube VII - optimizing form factor for ergonomics. The power cube after that is Power Cube VIII. See Machine Naming Convention.
Date
- Slated for Sat Nov 9 - Sun Nov 10.
- Tom Griffing is Guest Collaborative Production Run Director
Preparation
- Lathe up and running for spline coupler
- Tom has a coupler jig
- Lathe gearing via PowerCube + 6 Spline PTO Motor
BOM
- How much of http://opensourceecology.org/wiki/Power_Cube_6/Bill_of_Materials is still accurate?
Fabrication Diagram
See Fabrication Diagram explanation.
Fabrication
Coupler -