May Prep: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 38: Line 38:
:*Z axis
:*Z axis


=Organization=
=Tasks=
==General==
 
==Organization==
*OSE filing due May 15
*OSE filing due May 15
*Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)
*Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)

Revision as of 12:12, 8 May 2014

Preparing for Summer of Extreme Production - June 1 - Aug 31. Top priorities:

Production

Extreme Dev Protocols

  • Seed main site with OSE Collaboration Architecture
  • Extreme Onboarding
  • Do workshop collaborator survey - to attract developers
    • robot arm, quad delta, micro power cube
  • Update Contributor Log to a pulldown of machines and modules
  • Instructional on FreeCAD + Media going to Dozuki Guides
    1. Explainer on Development Boards. Development Board Script. Development Board Manual Page.
  • Visit China to integrate Extreme Learning
  • CAD Systems Tutorial - how to go from any file format to another
  • Stabilize video editing infrastructure. Determine video quality and upload standards.
  • Stabilize image upload infrastructure
  • Improve Team Membership. Every project should have a form collecting names of developers, so everyone can communicate with one another. People can edit the responses to remove their info if they are no longer interested. Keeps list management on Contributor side - allowing self-management - and takes responsibility off group organizer (good design)

Infrastructure

  1. Design Sprints on Modular Summer Camp
  2. Simple Off-Grid Microhouses - get PV panels + Simple MH Design
  3. Update Tech Team Culturing Survey - with map and a new wiki page - to take advantage of weekly design sprints, integrated within Development Week.
  4. Add more bandwidth to Factor e Farm

CEB

  • MREA contract - 2 presses
  • Shake down Pulverizer

Tractor

CNC Torch

  • Organize design sprint every other day
  • Organize tech review:
  • Alignment Procedure
  • Gear rack meshing procedure and troubleshooting
  • Gas flow control
  • Z axis

Tasks

General

Organization

  • OSE filing due May 15
  • Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)
  • Send out donation receipts
  • Transfer PayPal to new bank account
  • Deposit checks