May Prep: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 42: Line 42:
#Get van
#Get van
#Confirm MREA
#Confirm MREA
#Finalize all DPVs
#Prepare modular buildout strategy
#Prepare modular buildout strategy
#Last ad push -  
#Last ad push -  
#Caution map,for dozer work
#Caution map,for dozer work
#Court and payment - thu a holiday. .
#Court and payment - thu a holiday. .
#Taxes + other legal docs;
#pay import + WA tax
#pay import + WA tax
#Solar panels buy
#Solar panels buy
#Campground design - hypermodular design
#Campground design - hypermodular design
#Respond to DPVs
#Admin assistant
#Admin
#Crowd source Brick Press Instructional
#Crowd source Brick Press Instructional
#General workshop feedback form
#General workshop feedback form
#Milwaukee tickets refund
#Milwaukee tickets refund
#Cash all checks
#Liability followup
#Get tablets
#Get tablets
#Get some computers
#Get some computers
#Prep for dozing
#Prep for dozing - take down one structure
#Propane tank
#Propane tank - HabLab, 1000 gal.
#2-3 internet lines in HabLab  
#Microhouse propane tank - fill
#3 internet lines in HabLab  
#24 seating in Hablab
#24 seating in Hablab
#Set up OSE paypal.
 
#Get mailbox
#Get mailbox


==Organization==
==Organization==
*OSE filing due May 15
#Liability waiver followup
*Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)
#OSE filing due May 15
*Send out donation receipts
#Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)
*Transfer PayPal to new bank account
#Send out donation receipts
*Deposit checks
#Set up OSE paypal.
*
#Deposit checks

Revision as of 12:20, 8 May 2014

Preparing for Summer of Extreme Production - June 1 - Aug 31. Top priorities:

Production

Extreme Dev Protocols

  • Seed main site with OSE Collaboration Architecture
  • Extreme Onboarding
  • Do workshop collaborator survey - to attract developers
    • robot arm, quad delta, micro power cube
  • Update Contributor Log to a pulldown of machines and modules
  • Instructional on FreeCAD + Media going to Dozuki Guides
    1. Explainer on Development Boards. Development Board Script. Development Board Manual Page.
  • Visit China to integrate Extreme Learning
  • CAD Systems Tutorial - how to go from any file format to another
  • Stabilize video editing infrastructure. Determine video quality and upload standards.
  • Stabilize image upload infrastructure
  • Improve Team Membership. Every project should have a form collecting names of developers, so everyone can communicate with one another. People can edit the responses to remove their info if they are no longer interested. Keeps list management on Contributor side - allowing self-management - and takes responsibility off group organizer (good design)

Infrastructure

  1. Design Sprints on Modular Summer Camp
  2. Simple Off-Grid Microhouses - get PV panels + Simple MH Design
  3. Update Tech Team Culturing Survey - with map and a new wiki page - to take advantage of weekly design sprints, integrated within Development Week.
  4. Add more bandwidth to Factor e Farm

CEB

  • MREA contract - 2 presses
  • Shake down Pulverizer

Tractor

CNC Torch

  • Organize design sprint every other day
  • Organize tech review:
  • Alignment Procedure
  • Gear rack meshing procedure and troubleshooting
  • Gas flow control
  • Z axis

Tasks

General

  1. Get van
  2. Confirm MREA
  3. Finalize all DPVs
  4. Prepare modular buildout strategy
  5. Last ad push -
  6. Caution map,for dozer work
  7. Court and payment - thu a holiday. .
  8. pay import + WA tax
  9. Solar panels buy
  10. Campground design - hypermodular design
  11. Admin assistant
  12. Crowd source Brick Press Instructional
  13. General workshop feedback form
  14. Milwaukee tickets refund
  15. Get tablets
  16. Get some computers
  17. Prep for dozing - take down one structure
  18. Propane tank - HabLab, 1000 gal.
  19. Microhouse propane tank - fill
  20. 3 internet lines in HabLab
  21. 24 seating in Hablab
  1. Get mailbox

Organization

  1. Liability waiver followup
  2. OSE filing due May 15
  3. Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)
  4. Send out donation receipts
  5. Set up OSE paypal.
  6. Deposit checks