May Prep: Difference between revisions
Jump to navigation
Jump to search
(→Tasks) |
|||
Line 43: | Line 43: | ||
#Confirm MREA | #Confirm MREA | ||
#Finalize all DPVs | #Finalize all DPVs | ||
#Get Mixer working | |||
#Get new CEB controller | |||
#Build next brick press | |||
#Prepare modular buildout strategy | #Prepare modular buildout strategy | ||
#Last ad push | #Last ad push for DPVs | ||
#Court and payment - thu a holiday. . | #Court and payment - thu a holiday. . | ||
#pay import + WA tax | #pay import + WA tax | ||
Line 56: | Line 58: | ||
#Get tablets | #Get tablets | ||
#Get some computers | #Get some computers | ||
#Prep for dozing - take down one structure | #Prep for dozing - take down one structure, map for Dozer | ||
#Propane tank - HabLab, 1000 gal. | #Propane tank - HabLab, 1000 gal. | ||
#Microhouse propane tank - fill | #Microhouse propane tank - fill | ||
#3 internet lines in HabLab | #3 internet lines in HabLab | ||
#24 seating in Hablab | #24 seating in Hablab | ||
#Install mailbox | |||
# | #Install septic tank | ||
==Organization== | ==Organization== |
Revision as of 12:22, 8 May 2014
Preparing for Summer of Extreme Production - June 1 - Aug 31. Top priorities:
Production
Extreme Dev Protocols
- Seed main site with OSE Collaboration Architecture
- Extreme Onboarding
- Do workshop collaborator survey - to attract developers
- robot arm, quad delta, micro power cube
- Update Contributor Log to a pulldown of machines and modules
- Instructional on FreeCAD + Media going to Dozuki Guides
- Explainer on Development Boards. Development Board Script. Development Board Manual Page.
- Visit China to integrate Extreme Learning
- CAD Systems Tutorial - how to go from any file format to another
- Stabilize video editing infrastructure. Determine video quality and upload standards.
- Stabilize image upload infrastructure
- Improve Team Membership. Every project should have a form collecting names of developers, so everyone can communicate with one another. People can edit the responses to remove their info if they are no longer interested. Keeps list management on Contributor side - allowing self-management - and takes responsibility off group organizer (good design)
Infrastructure
- Design Sprints on Modular Summer Camp
- Simple Off-Grid Microhouses - get PV panels + Simple MH Design
- Update Tech Team Culturing Survey - with map and a new wiki page - to take advantage of weekly design sprints, integrated within Development Week.
- Add more bandwidth to Factor e Farm
CEB
- MREA contract - 2 presses
- Shake down Pulverizer
Tractor
CNC Torch
- Organize design sprint every other day
- Organize tech review:
- Alignment Procedure
- Gear rack meshing procedure and troubleshooting
- Gas flow control
- Z axis
Tasks
General
- Get van
- Confirm MREA
- Finalize all DPVs
- Get Mixer working
- Get new CEB controller
- Build next brick press
- Prepare modular buildout strategy
- Last ad push for DPVs
- Court and payment - thu a holiday. .
- pay import + WA tax
- Solar panels buy
- Campground design - hypermodular design
- Admin assistant
- Crowd source Brick Press Instructional
- General workshop feedback form
- Milwaukee tickets refund
- Get tablets
- Get some computers
- Prep for dozing - take down one structure, map for Dozer
- Propane tank - HabLab, 1000 gal.
- Microhouse propane tank - fill
- 3 internet lines in HabLab
- 24 seating in Hablab
- Install mailbox
- Install septic tank
Organization
- Liability waiver followup
- OSE filing due May 15
- Finalize state tax exemption, send to all Vendors (Sweiger, Schuske, Lowes, Menards, Sutherlands, Walmart, etc)
- Send out donation receipts
- Set up OSE paypal.
- Deposit checks