Technical Milestones: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
*Can [[MIG Casting]] convert 3D printed parts to steel and aluminum with sub 1 mm resolution? | *Can [[MIG Casting]] convert 3D printed parts to steel and aluminum with sub 1 mm resolution? | ||
*Can a 100kW induction furnace be built for $5k for the power electronics, cooling, and heating coil? Crucible is included. | *Can a 100kW induction furnace be built for $5k for the power electronics, cooling, and heating coil? Crucible is included. | ||
*Can cutting gas oxyhydrogen be produced at a cost of $500 per 10kW? | |||
*Can a welder power supply for MIG be built for $100 for 10kW? |
Revision as of 19:44, 10 March 2019
- Validate Solar Cement Calculations of 5 tons/day for 200kW array
- Can MIG Casting convert 3D printed parts to steel and aluminum with sub 1 mm resolution?
- Can a 100kW induction furnace be built for $5k for the power electronics, cooling, and heating coil? Crucible is included.
- Can cutting gas oxyhydrogen be produced at a cost of $500 per 10kW?
- Can a welder power supply for MIG be built for $100 for 10kW?