3D Printer Critical Path: Difference between revisions
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
=2019 April Detail= | =2019 April Detail= | ||
*Rationale - go to 120V heat bed to reduce power supply size. | *Rationale - go to 120V heat bed to reduce power supply size. | ||
*Don't include [[TMC2130]] initially as that will take time to optimize, even though it gets rid of the end stops. | *Don't include [[TMC2130]] initially as that will take time to optimize, even though it gets rid of the end stops. Use TMC2208 now. | ||
*Include clean wiring | *Include clean wiring | ||
*Include 3D printed corners | *Include 3D printed corners | ||
Goals: | |||
#Building new heated bed allows for a high performance printer | |||
#With 3D Printed control panel, electronics become simpler for builds | |||
#Silent operation is a good upgrade | |||
#Clone titan aero is lower cost for lower cost versions | |||
<html><img src="https://docs.google.com/drawings/d/e/2PACX-1vTfSAfTrmHoInbXzf88YbdiGC4TVi2Tnv5dcGp9sbjdtZfbf3xKjiH828dhPkunShj9OnSmFuMRlRxK/pub?w=701&h=394"></html> | <html><img src="https://docs.google.com/drawings/d/e/2PACX-1vTfSAfTrmHoInbXzf88YbdiGC4TVi2Tnv5dcGp9sbjdtZfbf3xKjiH828dhPkunShj9OnSmFuMRlRxK/pub?w=701&h=394"></html> |
Revision as of 21:56, 19 April 2019
March 4 2019 Week
Priorities:
- 8" bed version kit release, 12" frames for easy USPS ship
- 12" bed version kit release
- 36" bed version kit release
- And everything else in between.
2019 April Detail
- Rationale - go to 120V heat bed to reduce power supply size.
- Don't include TMC2130 initially as that will take time to optimize, even though it gets rid of the end stops. Use TMC2208 now.
- Include clean wiring
- Include 3D printed corners
Goals:
- Building new heated bed allows for a high performance printer
- With 3D Printed control panel, electronics become simpler for builds
- Silent operation is a good upgrade
- Clone titan aero is lower cost for lower cost versions
2019 April
2019 Jan
3D Printer Modules
Getting very clear about modules allows for very clear division of labor in a collaborative process.