STEAM Camp Finances: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 1: Line 1:
=March 2020=
=March 2020=
*Steam Camp Cost - Revenue Visualizer/Calculator
*Steam Camp Cost - Revenue Visualizer/Calculator
*This embed is editable directly.  Update the yellow fields to change the calculations!
*This embed is editable directly.  Update the yellow fields to change the calculations! [https://wiki.opensourceecology.org/wiki/Jeremy_Log#Tue_Mar_03: How to embed editable Google Sheet Here]
**Change fixed and variable costs to see total Net Revenue in upper table
**Change fixed and variable costs to see total Net Revenue in upper table
**Adjust # days and extra instructor count to see hourly return on time in lower table
**Adjust # days and extra instructor count to see hourly return on time in lower table
Line 7: Line 7:
   <iframe src="https://docs.google.com/spreadsheets/d/1Vven0eMArgjbrps68_Lw9-c_Z2zP9u525a4n_DVpeDc/edit?usp=sharing&amp;single=true&amp;widget=true&amp;headers=false&amp;rm=minimal"height=800 width=1200></iframe>
   <iframe src="https://docs.google.com/spreadsheets/d/1Vven0eMArgjbrps68_Lw9-c_Z2zP9u525a4n_DVpeDc/edit?usp=sharing&amp;single=true&amp;widget=true&amp;headers=false&amp;rm=minimal"height=800 width=1200></iframe>
</html>
</html>


=September 2019=
=September 2019=

Revision as of 16:39, 4 March 2020

March 2020

  • Steam Camp Cost - Revenue Visualizer/Calculator
  • This embed is editable directly. Update the yellow fields to change the calculations! How to embed editable Google Sheet Here
    • Change fixed and variable costs to see total Net Revenue in upper table
    • Adjust # days and extra instructor count to see hourly return on time in lower table

September 2019

This is for initial STEAM Camps during the development phase of the STEAM Camps.

  • Revenue per person - $1350 per seat, 9 days
  • 50% revenue share of net with Instructor.
  • Dev Kit B0M - $300
  • 9 Day STEAM Camp. Focus on 4 first days Boot Camp in OSE methods.
  • Invite the others who are already doing cutting edge stuff to present, with the last 5 days of STEAM Camps being Project Days dedicated specifically to creating a simple, viable 3D printed product of some sort.
  • $1k venue - or if free, this goes into the 50/50 share of savings
  • $1k video and publicity, $1k admin staff.

edit

Prototyping Kit BOM

The January STEAM Camp had a $521 cost of materials.

  • Around 500 in materials for D3D Universal package + experiments + project materials; $250 printer, $200 Pi Tablet

Evolution Notes

  • Once the video instructionals for the STEAM Camp are perfected, then the Remote Participation option becomes much more attractive. Both on-site and remote people should be watching the instructional videos for the builds instead of listening to the instructor - the instructor is there only for clarification. Video person attends and works on inserting the clarifications into the videos for future events.
  • Another future product could be video collections. Otherwise, all video is published freely.

Links