Open Source Concrete Work: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 15: Line 15:


<html><iframe width="560" height="315" src="https://www.youtube.com/embed/s1u30qLejdA" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html>
<html><iframe width="560" height="315" src="https://www.youtube.com/embed/s1u30qLejdA" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe></html>
*Batched at 6.
*Arrived on site at 7.
*Finished pour 8:30


=Links=
=Links=

Revision as of 19:05, 28 August 2021

Notes

  • Get yourself a power trowel - [1]
  • Polymesh F is an extra $5/yard for concrete work - [2]
  • Fiber still requires rebar [3]
  • Use Steel Fiber Concrete for strength

Workshop Foundation

  • 3000 sf workshop build, 2021

See Universal Prototyping Structure

Understanding Concrete Timing

In good weather - power trowel is about 2 hours after pour is finished.

  • Batched at 6.
  • Arrived on site at 7.
  • Finished pour 8:30