*Arrived on site at 7. | *Arrived on site at 7. | ||
*Finished pour 8:30 | *Finished pour 8:30 | ||
*Start mag floats + edger at about 10 AM | |||
=Links= | =Links= |
Revision as of 19:06, 28 August 2021
Notes
- Get yourself a power trowel - [1]
- Polymesh F is an extra $5/yard for concrete work - [2]
- Fiber still requires rebar [3]
- Use Steel Fiber Concrete for strength
Workshop Foundation
- 3000 sf workshop build, 2021
See Universal Prototyping Structure
Understanding Concrete Timing
In good weather - power trowel is about 2 hours after pour is finished.
- Batched at 6.
- Arrived on site at 7.
- Finished pour 8:30
- Start mag floats + edger at about 10 AM
Links
- Roman Concrete
- Solar Concrete
- Concrete Cutting Blade
- Polished Concrete
- Lime Concrete
- Micro Concrete Roofing (MCR)
- Concrete Polishing
- Concrete Mixer
- Concrete Fasteners
- Rosebud Concrete Pour
- Concrete
- Concrete Foundations
- Concrete in Cold Weather
- Concrete Slab
- Reinforced Concrete Pipe
- Advanced Concretes
- Concrete 3D Printers
- Concrete Paint