Extreme Seed Eco-Home: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 5: | Line 5: | ||
*Hot water heat pump - extra $4000 [https://skipthewarehouse.com/sanco2-gs4-45hpc-heat-pump-water-heater-outdoor-only] at 20 gph capacity or Hot Water Heat Pump instead and 48kBTU (see [[Hot Water Heat Pump]] | *Hot water heat pump - extra $4000 [https://skipthewarehouse.com/sanco2-gs4-45hpc-heat-pump-water-heater-outdoor-only] at 20 gph capacity or Hot Water Heat Pump instead and 48kBTU (see [[Hot Water Heat Pump]] | ||
*No added cost - open source inverter, | *No added cost - open source inverter, | ||
*Rainwater collection - 2000 gal. Utility house is an adjacent enclosure. | *Rainwater collection - 2000 gal. Utility house is an adjacent enclosure. - $2k | ||
*4 tote Biodigester waste processor with 1000 gal processing volume, for 4 people. -$2k | *4 tote Biodigester waste processor with 1000 gal processing volume, for 4 people. -$2k | ||
*Shit frier backup - $2k. | *Shit frier backup - $2k. | ||
Line 12: | Line 12: | ||
*Power Wall of 1 kWhr for tools etc, $2k. | *Power Wall of 1 kWhr for tools etc, $2k. | ||
*[[Compressed Air Storage]] backup. $2500 in cost for 1 hphr. This is equivalent to batteries, at lifetime design instead of throwaway. | *[[Compressed Air Storage]] backup. $2500 in cost for 1 hphr. This is equivalent to batteries, at lifetime design instead of throwaway. | ||
'''$19.5k extra for full autonomous option. With hydrogen - cost may be more'''. Fits within Cost Savings Budget - house ends up no extra cost and is Extreme in features. | |||
=Other at extra cost= | =Other at extra cost= | ||
*Includes water reclamation for closed-loop water cycle with sand filters, etc. | *Includes water reclamation for closed-loop water cycle with sand filters, etc. | ||
*Hydrogen energy option from [https://www.enapter.com/aem-electrolysers/aem-electrolyser-el-4 Enapter] | *Hydrogen energy option from [https://www.enapter.com/aem-electrolysers/aem-electrolyser-el-4 Enapter] | ||
*20kW Wind turbine - $5k |
Revision as of 18:19, 3 December 2023
- $5k more in PV for 12kW, but that is standard for 2000 sf version, so is not counted.
- Off-grid autonomous with AWG ($2k) at 1 liter per hour and 500W kW solar requirement (25% duty factor)
- Distiller for 3kW (6 gallons for the day) ($2k).
- Heat Storage of 20 totes - $3k
- Hot water heat pump - extra $4000 [1] at 20 gph capacity or Hot Water Heat Pump instead and 48kBTU (see Hot Water Heat Pump
- No added cost - open source inverter,
- Rainwater collection - 2000 gal. Utility house is an adjacent enclosure. - $2k
- 4 tote Biodigester waste processor with 1000 gal processing volume, for 4 people. -$2k
- Shit frier backup - $2k.
- Biodigester works with Shit Dehydrator, and final product is greywater for the greywater garden.
- Service contract for utilities (water, heat, power, waste)
- Power Wall of 1 kWhr for tools etc, $2k.
- Compressed Air Storage backup. $2500 in cost for 1 hphr. This is equivalent to batteries, at lifetime design instead of throwaway.
$19.5k extra for full autonomous option. With hydrogen - cost may be more. Fits within Cost Savings Budget - house ends up no extra cost and is Extreme in features.
Other at extra cost
- Includes water reclamation for closed-loop water cycle with sand filters, etc.
- Hydrogen energy option from Enapter
- 20kW Wind turbine - $5k