Power Cube/Manufacturing Instructions/Fabrication June 2011: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 13: Line 13:
= Jig (optional) =
= Jig (optional) =


[[Image:JigSketchup.jpg]]
[[Image:JigSketchup.jpg|400px]]
[[Image:Jig.jpg]]
[[Image:Jig.jpg]]



Revision as of 21:01, 11 June 2011

Under construction icon.png This page is currently under construction and might undergo drastic changes within a short span of time.


=Power Cube 4.0 Construction


Here's how to replicate our Powercube 4.0 design. Keep in mind that this the powercube is still at the prototype stages and designs are likely to change. SketchUp files are available on OpenPario (link). Inventor files are in development.



Jig (optional)

JigSketchup.jpg Jig.jpg

Materials List Steel 14' Angle 2" (1/4") 7'2" Rebar (1/2")


Cut List Angle

 1'10 1/4"   x2  (red)
 2'5 1/2"    x2  (green)
 2'2 1/2"    x2  (yellow)

Rebar

 2'6 1/2"
 2'3 1/2"    x2


File:Assembly.jpg

Assembly of the Jig is fairly straight forward. Tack and weld the pieces in place. Be sure to note the overlapping order and the notch made at the bottom of the 1'10 1/4" piece (red).


Jig Outside Corner.jpg Also note that the corners are offset 3/4" to give room for the cube to sit snugly in the frame (and a convenient gap for welding the corners.)

1'10 1/4" (red) 2'5 1/2" (green) 2'2 1/2" (yellow)



JigSketchUp





Frame

Frame Welding Jig

  • List frame welding jig materials cut list:
  • Show Sketchup picture of cut list:

Pcjigmaterials.jpg

  • Show Sketchup of finished jig:

File:Pcjigsketchup.jpg

  • Show picture of ...
  • etc
  • etc
  • etc

Hydraulic Reservoir

Fuel Tank

CNC Torch Required Materials

(if CNC Torch Table not available, torch manually)

Motor Plates

Torch Required Materials

Assemble and Weld

  1. Prepare 12 frame members:

File:Framemembers.jpg