CEB instructionals to be transfered to Make Projects: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 10: Line 10:
=Ready To Transfer=
=Ready To Transfer=
The following pages are ready to be transfered to make. Items which can be grouped into one make page are listed together. The text will not change:
The following pages are ready to be transfered to make. Items which can be grouped into one make page are listed together. The text will not change:
*Make page titled "Support system": [[CEB Press/Manufacturing Instructions/Leg Holders|Leg Holders]], [[CEB Press/Manufacturing Instructions/Legs|Legs]], [[CEB Press/Manufacturing Instructions/Feet|Feet]], [[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]]
*Hopper and grate supports: [[CEB Press/Manufacturing Instructions/Grate mounts|Grate Mounts]], [[CEB Press/Manufacturing Instructions/Hopper supports|Hopper Supports]]
*Hopper and grate supports: [[CEB Press/Manufacturing Instructions/Grate mounts|Grate Mounts]], [[CEB Press/Manufacturing Instructions/Hopper supports|Hopper Supports]]
*[[CEB Press/Manufacturing Instructions/Soil Shaker| Shaker motor mount]]-Can be broken into 3 guides: Motor mount [[Image:check.png]], Hammer and shaft (bolt shaft to coupler and hammer), and assembly
*[[CEB Press/Manufacturing Instructions/Soil Shaker| Shaker motor mount]]-Can be broken into 3 guides: Motor mount [[Image:check.png]], Hammer and shaft (bolt shaft to coupler and hammer), and assembly


=Completed=
=Completed=
*[http://makeprojects.com/Project/CEB-Support-System/1718/1 Structural support system]- [[CEB Press/Manufacturing Instructions/Leg Holders|Leg Holders]], [[CEB Press/Manufacturing Instructions/Legs|Legs]], [[CEB Press/Manufacturing Instructions/Feet|Feet]], [[CEB Press/Manufacturing Instructions/Arms - secondary|Arms - secondary]]- still needs hole diagrams

Revision as of 19:42, 14 December 2011

Transfer instructions

  • Please transfer the Required tools and materials to the introduction, as well as a link to the sketchup of the part.
  • Break the steps appropriately for the new guide.
  • Images aren't necessary- I'll take care of them once we get the final sketchup version of the CEB and the 2D cad drawings.
  • Please edit this page and place a check ( Check.png ) next to the page when the text transfer is complete.
  • When the images are all uploaded, I will move the link to the completed section.

-Brianna Kufa

Ready To Transfer

The following pages are ready to be transfered to make. Items which can be grouped into one make page are listed together. The text will not change:

Completed