Power Cube VII: Difference between revisions
Jump to navigation
Jump to search
m (→Fabrication) |
(→BOM) |
||
Line 12: | Line 12: | ||
=BOM= | =BOM= | ||
*How much of http://opensourceecology.org/wiki/Power_Cube_6/Bill_of_Materials is still accurate? | *How much of http://opensourceecology.org/wiki/Power_Cube_6/Bill_of_Materials is still accurate? | ||
**Hydraulics, Metal, engine, other, hardware - all good | |||
**Get hose crimper and avoid hoses from Surpluscenter | |||
=Fabrication Diagram= | =Fabrication Diagram= |
Revision as of 16:15, 31 October 2012
See Power Cube 6 for latest Power Cube Documentation. Tom is currently building Power Cube VII - optimizing form factor for ergonomics. The power cube after that is Power Cube VIII. See Machine Naming Convention.
Date
- Slated for Sat Nov 9 - Sun Nov 10.
- Tom Griffing is Guest Collaborative Production Run Director
Preparation
- Lathe up and running for spline coupler
- Tom has a coupler jig
- Lathe gearing via PowerCube + 6 Spline PTO Motor
BOM
- How much of http://opensourceecology.org/wiki/Power_Cube_6/Bill_of_Materials is still accurate?
- Hydraulics, Metal, engine, other, hardware - all good
- Get hose crimper and avoid hoses from Surpluscenter
Fabrication Diagram
See Fabrication Diagram explanation.
Power HyperCube VII
HyperCube for Hypermodularity.
Quick Connect Plate for Power Cube Pump Detail
Fabrication
Coupler -
Research
- Mechanical shaft quick coupling patent - [1]