Mon, July 03, 2017
Started looking through details about the thermal components for the LFX
Uploaded the barebones File:LFX Heat Band.fcstd no wires or clamp yet.
Wed, June 28, 2017
Updated CNC Torch Table with Z axes, removed the doubled up carriage on the X axes, and shortened the angle irons.
Tue, June 27, 2017
File:CNC Torch Table Assembly.fcstd almost complete.
Wed, June 21, 2017
File:D3D Universal Axis 1 inch.fcstd including all 6 major parts uploaded.
Universal Axis 1 inch Simplified complete
Tue, June 20, 2017
Assembling 1" Universal Axis and simplifying
Fri, June 16, 2017
Putting D3D 13 Assembly CAD simple together
File:D3D 13 CAD Assembly simple.fcstd
Mon, May 29, 2017
Uploaded:
File:Universal Axis Idler simple.fcstd
File:Universal Axis Carriage Side simple.fcstd
File:Universal Axis Motor Simple.fcstd
Wed, May 24, 2017
Started simplification of x-axis assembly.
Uploaded:
File:D3D End Stop Assembly simplified.fcstd ( [| Inventory updated] )
File:D3D End Stop Switch simple.fcstd
File:D3D End Stop Interface simple.fcstd
Wed, May 17, 2017
Got caught up on Marcin's follow up video.
Did some updates to the D3D 16" CAD Inventory
Uploaded:
File:D3D 8mm rod.fcstd File:8mm bearing lmuu.fcstd
Sat, May 13, 2017
Completed the OSE FreeCAD exam.
Mon, April 11, 2016
- Wrote Seattle Buid Group description
Wed, April 6, 2016
- Called Folger Tech to inform them of future order, left message, and got a call back confirming. Will call back later to verify once more.