Collaboration Protocol Log

From Open Source Ecology
Revision as of 18:16, 11 December 2021 by Marcin (talk | contribs) (Created page with "=Sat Dec 11, 2021= Already we have generic Collaboration Protocol. Onto this we can add metalayers of strategy. Such strategies are intended to be blueprints so that large...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Sat Dec 11, 2021

Already we have generic Collaboration Protocol. Onto this we can add metalayers of strategy. Such strategies are intended to be blueprints so that large numbers of people can participate - by design the blueprints must be scalable. Thus there is a chance that once sufficient recruitment occurs, large-scale collaboration processes (for the transition to the open source economy) can begin.

General strategy 1:

  1. Study industry standards. Understand institutions and business models that already work and have been proven to scale.
  2. Innovation. Using Techniques for Creativity, create a list of Societal Innovations that have the Potential to Move the Dial - ie, transform an industry at the least, but ideally transform a paradigm across industries.
  3. Create an enterprise design with about 50% of #1 above, and 50% of #2
  4. Topgrade for industry experts. These experts must have a track record of a high level of purpose and ethics in their life and work. Invite these SMEs to the table to a 3 day weekend.
  5. Create an operations manual with these experts, focusing on design rationales of key business decisions/operations/goals. Include key enabling resources and strategy for obtaining these resources.
  6. Publish. The plan is worthless, but the planning that went into it is priceless.