Well-drilling Rig Intro

From Open Source Ecology
Jump to navigation Jump to search


Well-drilling Rig
   Home  |  Research & Development  |  Bill of Materials  |  Manufacturing Instructions  |  User's Manual  |  User Reviews    File:Well-drilling Rig.png

Main > Water


Well Drilling Rig - water is crucial for human and animal consumption, washing, irrigation, and industrial processes. Access to clean drinking water is one of the key challenges facing many countries today.

Well - Background Debriefing

Well drilling can be broken down into three basic components: breaking up the rock/soil in the well column, removing the cuttings from the well column, stabilising the well column and preparing it for production. The first, the breaking of rock/soil to produce cuttings is achieved by a cutting tool, either a rotating drill bit or a raised and dropped 'chisel-like' device; for our well drilling rig we will employ the rotating bit design as it is a much more common method of well preparation. The bit is rotated by attaching it to the end of a long series of pipes connected together called the drill string, turning the drill string turns the cutting bit.

Once the bit has cut up the rock/dirt it needs to be lifted up out of the well. The most common way of doing this is to pump water/mud down the center of the piping that makes up the drill string, and letting it flow out the end of the bit. By continuously pumping more drilling mud into the well, it eventually fills up and the only place left for the mud to go is to be pushed up to the top of the well and spill over the side, carrying the cuttings along with it. This flow of mud and broken up rock spills over the top of the well and is sent to a small settling pond where the rocks and sand settle out of it. After some time in the settling pond the mud is recycled by the mud pump and pushed back down the well again to pick up and remove more cuttings allowing the well to be contiuously drilled deeper and deeper, stopping only to add new sections of drill string.

After the well is drilled to the desired depth it must be finished and put into production. The drill string is withrawn from the well, but the well is left full of water/drilling mud to prevent the sides from caving in until the well is finished. After the drill string is out the casing pipe is slid into the well to prevent caving in of the sides. Once this is done, the drilling mud is removed from the well column leaving it empty. At this point a water bucket or temporary well pump is placed in the well and as much water as possible is drawn up for a test period of 1 to 3 days to clean out any remaining drilling mud and stabilize the aquifer for production. Also during this time the water extraction rate is measured to verify that it is worth continuing to finish the well (poor producing wells may have the casing withdrawn and be re-drilled at a more favorable location). Once the well is shown to be a producing well it is capped with a cement cap, and the water pump is installed making the well operational.

Resource Map

See videos at www.vimeo.com from EMAS for hand powered low tech water well drilling technologies.

Collaboration

Review of Project Status

Well - Current Work

Water/Mud Swivel

link to some basic ideas about a swivel google doc


Waterwellswivelmach1.png


Drill String Raising/Lowering

idea for a lifetrac enabled pulling apparatus google doc

LifeTracWaterWellPullingUnit.png

square tubing could be reused on other projects after well is complete

could wooden 4x4s work? need extra support beams?

A Preliminary Design

Well-Drilling Rig.png

Here is a first rendering of the well drilling rig as rendered in BRL-CAD. The hydraulic pump (green) from the MicroTrac is shown mounted with the shaft downwards on the blue sliding frame which moves up and down the side tracks. The mounting of the motor to the green frame will use the same two bolt quick release system employed by the MicroTrac to allow for interoperability and quick changeovers from one device to the other. The rotating shaft from the hydraulic pump is connected to the purple section of drill string piping which stays centered in the swivel tee allowing drilling mud to flow into it and down the drill string (shown in light green). The purple section of piping is held horizontally by the holes in the top and bottom of the frame which are only slightly bigger than the purple pipe. This purple section of piping is supported vertically by the rotating bearing assembly which rides on the top of the sliding frame. If rock is encountered while drilling the small circular plate above the bearing will push the bearing down putting extra weight on the drill string. This allows weights to be hung along the back panel of the frame allowing the amount of downward force on the drill string to be manipulated. In the reverse situation, when tripping the drill string out of the hole, the purple section will pull down on the bearing causing it to move off the circular plate and against the frame below, pushing down on the frame and holding up the drill string as it is withdrawn from the well.

At ground level the the drill string passes through the red drill collar which bolts down to the gray baseplate allowing it to be easily removed or swapped for a smaller diameter collar (the square collar flange plate will be the same for all collars allowing for interchangeability). The machine currently is shown with a 6 inch inside diameter collar allowing a 6 inch well casing ti exactly fit inside it. At the bottom of the drill string a simple gray bit is shown which is just a section of 6" pipe with partially covered end caps connected to the bottom of the lowest section of drill string piping. Since the actual drill string piping is much smaller than 6 inches (probably only 3 or 4 inches at most for a water well drilling rig) the collar can also serve analogous to the function of a rotary table on an oil rig allowing a slip to be used to support the drill string when it is detached from the turning head at the top of the rig.

The vertical side tracks can either be composed of three flat pieces of steel welded along the edges to form a channel or can be made from large (~10 cm or bigger square tubing which has been cut in half lengthwise). If additional ground stability on the baseplate is required, four long steel stakes can be driven through the corners of the baseplate to prevent it from sliding. If these stakes are just simple pieces of re-bar they can even be left in place after the baseplate is removed (when the drilling rig is lifted straight up, or tipped down to one side the baseplate would just lift off the top of the stakes), these could then be cemented into the top pad when the wellhead is capped preventing it from sliding off the top of the well, or they can be removed for re-use as well.

The side tracks bolt to the baseplate and to each other with additional plates on the outside of the tracks a pair of bolts at each end (outer plates not shown). Since the bolt holes on all pieces of this side track material are 10 cm and 20 cm in from the ends of the piece they are interchangeable with or attachable to any other piece no matter whether they bolt to the baseplate, the top crown, or another section. This interchangeability on the side rails means you can build a small test rig with short rails for prototyping and shallow well drilling and then later on you can add additional height to the drill rig by adding on longer tracks letting you run deeper before having to break the drill string to add another section (making digging very deep wells much faster). Disassembling the side tracks would be easy to do (only 4 bolts per section) allowing the tracks to be disassembled for long distance transport and the re-assembled at the well site. In order to make room for the bolt heads on the inside of the tracks, the blue frame has 4 cm by 4 cm channels cut into each side; this lets the bolts securing the side tracks pass by without affecting the guiding done by the outside corners of the frame.

For short distance transport the rig can be tipped down and pulled on the wheels (a hitch could be attached at the top of the crown). When the rig is at the well site it is tipped up (which should be possible for 2 people to do) and it is held upright by the red arm on the top which will attach to a specially designed ground stake. The red support rod also prevents torsion of the top of the machine due to the length of the crossmember. The support rod can be used either in front of, or behind the drilling rig depending on the layout of the site and the ground conditions. A second mode of transport can be achieved if you want to drill many wells in a small area, for example along the edge of a field. When the rig is upright the wheels can be easily removed by removing the pins holding in the red wheel supports. Once the wheels are off the rig can be picked up by the tractor using the small red lifting brackets seen on the rails behind the sliding frame. These brackets should fit perfectly on the mounting for the tractor, it would be like picking up the bucket or any of the other front end tools. This allows the rig to be easily repositioned since the tractor can just set it down right on the wellhead. After it is set in place the red rod is secured on the front side of the rig. The tractor can then detach from the drill rig and use the bail spike to raise and lower the sliding frame (instead of using the manual winch which some builders of the rig may choose to omit entirely).

The side tracks can also be a mounting point for a simple hand cranked, direct drive winch; similar to the winches on boat trailers. The winch, shown in brown in the rendering dispenses a cable up over the two pulleys on the top of the crown. The pulley near the centerline of the machine then supports the sliding frame below it allowing it to travel freely up the center of the side channels. Instead of a hand winch and two pulleys as shown a chain hoist could also be used.

Please let me know what you think about the pictured design, once I have added the rest of the drilling equipment and after making any changes suggested here, I will post the .g file so other people can play around with it.

Drill Bits

open source tricone bit

i think we should start thinking about ways to make tricone bits

Recommend you build "drag" bit, tricone or roller cone bit rely on weight of drill string to break up rock. Most of the designs shown will not have sufficient weight on bit for tricone bit to drill rock.

stack plate steel?

rivet to housing?

Drill String

welded pipe

want to look into rolling flat plate into tubes and welding seams?

Purchased Pipe

For phase I communities that don't have the ability to produce their own piping for drill string we should find suppliers for it and get price estimates. We should also find a good, common pipe size that we should use for the machine making it easy to buy drill string and once the community can produce their own piping for drill string, since it is a commonly used size they can produce extra for sale by other users (for things other than drill string).

Well Casing

After the well is finished the walls of the well need to be prevented from caving in and collapsing the well, this is the job of well casing. Well casing is usually installed after the well is drilled out (i.e. casing is not present during the drilling operations), however in very soft soil the well may need to be cased even during the drilling phase. If this is required you can drill for some distance with the largest bit you have, then case that section, then use a smaller bit to drill further, case that section with smaller well casing, etc. The well casing for most of the well can be simple pipe, approximately 4 to 6 inches in diameter for a typical well; the bottom section should have holes drilled in it and/or sections of screen to allow the water to infiltrate into the well bore from the aquifer.

could poly pipe work for well casing?

Yes, PVC pipe is often used to case small water wells, under 8"/200mm diameter borehole.

Polyethylene_from_Ethanol

what size casing is typically used in water well?

You need a minimum of 4"/100mm to allow for installation of cast iron cylinder for India MKII or MKIII by AOV. This will also allow installation of the Afri-Dev type pump.


Mud Pump

google doc

pump types

what kind of simple designs could be utilized for pumping mud down the drill pipe?

possible plans for reuse of mud pump materials after well is drilled?

does factory farm need this type of pump for other things?

what were some of the pros and cons of the hydraulic pump used on the first drill attempt.

OpenSourceMudPumpIdea screwpump.png

Well Pump

was the design used on first factory farm well successful? does the design need improvement?

Well - Developments Needed

Well - General

The ability to dig wells allows communities to access underground resources:

-water

-geothermal

Not to mention the power of being able to dig deep holes for support posts or pilings.

Well - Specific

Well - Information Work

Well - Hardware Work

Well - Sign-in

Development Work Template

  1. Well - Product Definition
    1. Well - General
    2. Well - General Scope
    3. Well - Product Ecology
      1. Well - Localization
      2. Well - Scaleability
      3. Well - Analysis of Scale
      4. Well - Lifecycle Analysis
    4. Well - Enterprise Options
    5. Well - Development Approach
      1. Well - Timeline
      2. Well - Development Budget
        1. Well - Value Spent
        2. Well - Value available
        3. Well - Value needed
    6. Well - Deliverables and Product Specifications
    7. Well - Industry Standards
    8. Well - Market and Market Segmentation
    9. Well - Salient Features and Keys to Success
  2. Well - Technical Design
    1. Well - Product System Design
      1. Well - Diagrams and Conceptual Drawings
        1. Well - Pattern Language Icons
        2. Well - Structural Diagram
        3. Well - Funcional or Process Diagram
        4. Well - Workflow
      2. Well - Technical Issues
      3. Well - Deployment Strategy
      4. Well - Performance specifications
      5. Well - Calculations
        1. Well - Design Calculations
        2. Well - Yields
        3. Well - Rates
        4. Well - Structural Calculations
        5. Well - Power Requirements
        6. Well - Ergonomics of Production
        7. Well -Time Requirements
        8. Well - Economic Breakeven Analysis
        9. Well - Scaleability Calculations
        10. Well - Growth Calculations
      6. Well - Technical Drawings and CAD
      7. Well - CAM Files
    2. Well - Component Design
      1. Well - Diagrams
      2. Well - Conceptual drawings
      3. Well - Performance specifications
      4. Well - Performance calculations
      5. Well - Technical drawings and CAD
      6. Well - CAM files whenever available
    3. Well - Subcomponents
  3. Well - Deployment and Results
    1. Well - Production steps
    2. Well - Flexible Fabrication or Production
    3. Well - Bill of materials
    4. Well - Pictures and Video
    5. Well - Data
  4. Well - Documentation and Education
    1. Well - Documentation
    2. Well - Enterprise Plans
  5. Well - Resource Development
    1. Well - Identifying Stakeholders
      1. Well - Information Collaboration
        1. Well - Wiki Markup
        2. Well - Addition of Supporting References
        3. Well - Production of diagrams, flowcharts, 3D computer models, and other qualitative information architecture
        4. Well - Technical Calculations, Drawings, CAD, CAM, other
      2. Well - Prototyping
      3. Well - Funding
      4. Well - Preordering working products
      5. Well - Grantwriting
      6. Well - Publicity
      7. Well - User/Fabricator Training and Accreditation
      8. Well - Standards and Certification Developmen
      9. Well - Other
    2. Well - Grantwriting
      1. Well - Volunteer grantwriters
      2. Well - Professional, Outcome-Based Grantwriters
    3. Well - Collaborative Stakeholder Funding
    4. Well - Tool and Material Donations
    5. Well - Charitable Contributions