Concept
- Produce lumber, concrete, plastic parts, CEB, and gravel anywhere on the road with onsite materials.
 - 20kW=120kWhr/day = 500 lb cement/day = 5000 lb concrete = 1.7 yards.
 - Has energy storage, 5 days is 20 kg hydrogen.
 - 100% renewable energy, 100% local materials
 - $100k infrastructure target cost. Pays for itself in one house build.
 
Solar Construction Trailer
Solar Concrete Production
From Solar Concrete
Trailers
- 40' gooseneck - $25k . 30k lb gross - [1]
 - 30' gooseneck - $18k . 23k gross [2]
 - 20' gooseneck - $12k - 14l lb - [3]
 
Trucks
- F350 Dually gets to 30k lb trailers - [4]
 - F350 singles are only up to 20k trailers. F250 diesel single wheels - go up to 20k trailers. Everything below (F250 gas or F150) go up to the 14k lb load range.
 - For OSE - 2000 lb in trusses, and 100 lb per module x48 modules. For starters, 14k lb trailers may be ok, but push the limits of heavy equipment rental.
 - There are a lot of people here who stop pulling trailers in the upper 30' range with an F150 due to the light weight of the vehicle and added sway. - [5]