Integrated Scaling Strategy

From Open Source Ecology
Jump to navigation Jump to search

edit


Core

  • $25k vs 120k labor - 4.8x lower labor cost based on OSE Build Cost.
  • Formula: we give back 50% to the customer in added value, and 50% for the larger open source economy transition

Unique Features

  • Integrated tools vBOM, materials, CAD, procedures - rapid, integrated learning.
  • Tool manufacturing - construction tools
  • Materials Manufacturing
  • Solar concrete
  • 100% renewable energy
  • Certificates for tech schools: come up with a formula for pay scale, based on average starting salary, and value added based on their competency.
    • Pay increase is determined by carefully developed formula for how much added value we are definitely produce (see Zones of Possibility). Based on delivery of integrated Quad Modules
    • Field day: learn at home, and field day consists of building modules for us. This is their certification, according to a refined procedure.
      • Field day: we build an entire house kit from scratch.