=Power Cube 4.0 Construction
Here's how to replicate our Powercube 4.0 design. Keep in mind that this the powercube is still at the prototype stages and designs are likely to change. SketchUp files are available on OpenPario (link). Inventor files are in development.
Jig (optional)
Materials List Steel 14' Angle 2" (1/4") 7'2" Rebar (1/2")
Cut List
Angle
1'10 1/4" x2 (red) 2'5 1/2" x2 (green) 2'2 1/2" x2 (yellow)
Rebar
2'6 1/2" 2'3 1/2" x2
Assembly of the Jig is fairly straight forward. Tack and weld the pieces in place. Be sure to note the overlapping order and the notch made at the bottom of the 1'10 1/4" piece (red).
Also note that the corners are offset 3/4" to give room for the cube to sit snugly in the frame (and a convenient gap for welding the corners.)
1'10 1/4" (red) 2'5 1/2" (green) 2'2 1/2" (yellow)
JigSketchUp
Frame
Frame Welding Jig
- List frame welding jig materials cut list:
- Show Sketchup picture of cut list:
- Show Sketchup of finished jig:
- Show picture of ...
- etc
- etc
- etc
Hydraulic Reservoir
Fuel Tank
CNC Torch Required Materials
(if CNC Torch Table not available, torch manually)
Motor Plates
Torch Required Materials
Assemble and Weld
- Prepare 12 frame members: