Minimum Workable Feature of XM Process Design

From Open Source Ecology
Revision as of 18:09, 13 March 2012 by Marcin (talk | contribs)
Jump to navigation Jump to search

All development exists on component level

  1. Definition of Ready
  2. Set up Scrumy project
  3. Set up XM Project Page
  4. Daily development log
  5. Daily Vlog
  6. Specification and design rationale
  7. Conceptual design diagram
  8. Machine functional process diagram
  9. CAD
  10. Fabrication Drawings
  11. Fabrication Review
  12. Tooling requirements defined
  13. BOM
  14. Sourcing information
  15. Master Fabrication PDF
  16. CAM files
  17. CAE
  1. RP
  2. Bench Prototype
  3. SEBD
  4. Control Code
  5. Code
  6. Circuit Diagram
  7. Exploded Part Diagram
  8. Test procedure defined
  9. Test procedure performed
  10. Daily Vlog
  11. Daily Log
  12. Scaling Calculations
  13. Working prototype
  14. Budget
  15. Contract First Manufacturing (Interface Design)
  16. Rapid Prototype done via RP Strategy
  17. Recruit SME designer
  18. Recruit SME prototyper
  19. Integration into machine
  20. SME XM Proposal Brief from developer

Strategic Review

  1. Sourcing strategy
  2. Sourcing review
  3. BOM review
  4. DfF (Design for Fabrication) review


Integration

  1. Fabrication optimization
  2. Cnx.org upgrade
  3. Integration into machine
  4. Regression testing (integrated machine testing)
  5. Product ecology testing (test with other machines)

]]