Stabilize Site Infrastructure
Jump to navigation
Jump to search
We are off-grid. We are currently stabilizing housing, water, power, and internet infrastructure.
As of Sep. 1, 2012:
We are finishing up the last 3 rooms of HabLab to accommodate 9 people. We are planning 2 OSE Microhouse prototypes to be built by the end of this year. We are installing a winter stove and expanding our kitchen, as well as winterizing the house.
We have stabilized our workshop power infrastructure to include 29 kW of inverter power and 28 kW of generator power. We have just dug a well and are diggig a 3/4 acre pond for agriculture watering, and we are currently trenching water lines
We are stabilizing our internet infrastructure of two 4MB internet lines, which currently have connection speed issues.