User contributions for Margaret Ida
Jump to navigation
Jump to search
19 September 2011
- 14:4914:49, 19 September 2011 diff hist +54 Workshop Planning Activities No edit summary
- 14:3714:37, 19 September 2011 diff hist +1 m OSE Shop 2011 No edit summary
- 14:3414:34, 19 September 2011 diff hist +122 Hab Lab Design Gallery No edit summary
- 14:3014:30, 19 September 2011 diff hist +13 Hab Lab on 16' and 21' column centers No edit summary current
- 14:2914:29, 19 September 2011 diff hist +41 Hab Lab on 16' and 21' column centers No edit summary
- 14:2714:27, 19 September 2011 diff hist 0 N File:9-19-11 HabLabModel.png No edit summary current
- 13:3013:30, 19 September 2011 diff hist +16 Hab Lab Design Gallery →Submitted Designs
- 13:2813:28, 19 September 2011 diff hist +12 Hab Lab Design Gallery →Submitted Designs
- 13:2413:24, 19 September 2011 diff hist +60 Category:Housing and construction No edit summary
- 13:2013:20, 19 September 2011 diff hist +87 Category:Housing and construction No edit summary
- 13:0913:09, 19 September 2011 diff hist +12 Category:Housing and construction No edit summary
- 13:0713:07, 19 September 2011 diff hist +60 Category:Housing and construction No edit summary
- 13:0313:03, 19 September 2011 diff hist +66 Hab Lab Design Gallery →Submitted Designs
- 12:5612:56, 19 September 2011 diff hist +370 Hab Lab on 16' and 21' column centers No edit summary
- 12:5112:51, 19 September 2011 diff hist 0 Hab Lab on 16' and 21' column centers No edit summary
- 12:5012:50, 19 September 2011 diff hist +49 Hab Lab on 16' and 21' column centers No edit summary
- 12:4912:49, 19 September 2011 diff hist +354 N Hab Lab on 16' and 21' column centers Created page with "This design uses the 21' expanded centers used in the workshop design and adjusts room sizes to the available spaces. Kitchen, Bath, Central gathering, Utility/storage, and heati..."
- 12:4312:43, 19 September 2011 diff hist +71 N File:HabLab MIH (3).png HabLab design with 16' and 21' centers - as used in the workshop design current
- 12:2612:26, 19 September 2011 diff hist 0 Room-size based Hab Lab Design No edit summary current
- 12:2512:25, 19 September 2011 diff hist 0 Hab Lab Design Gallery →Submitted Designs
- 12:2412:24, 19 September 2011 diff hist +59 Hab Lab Design Gallery →Submitted Designs
- 12:2012:20, 19 September 2011 diff hist +48 Room-size based Hab Lab Design No edit summary
- 12:1612:16, 19 September 2011 diff hist +35 N File:HabLab MIH (2).png Design based on standard room sizes current
- 12:1412:14, 19 September 2011 diff hist +511 N Room-size based Hab Lab Design Created page with "With some discussion about desired room sizes in the Hab Lab, this design was laid out to include larger 10'x12' rooms and smaller 8'x10' rooms with a central open area large eno..."
- 11:5511:55, 19 September 2011 diff hist +59 Hab Lab Design Gallery →Submitted Designs
- 11:5011:50, 19 September 2011 diff hist +42 16 Foot Centers Hab Lab Design No edit summary current
- 11:4311:43, 19 September 2011 diff hist +426 N 16 Foot Centers Hab Lab Design Created page with "Using the standard 16-foot column centers set up in the Workshop design, a multiple-room residence is proposed including considerations for kitchen, bath, utility/storage, and he..."
- 11:1211:12, 19 September 2011 diff hist +52 N File:HabLab MIH.png First draft - on 16' centers - 8 and 10 room options current
- 10:5510:55, 19 September 2011 diff hist +218 OSE Shop 2011 →Design Notes
16 September 2011
- 03:0203:02, 16 September 2011 diff hist +283 OSE Shop 2011 No edit summary
- 02:5402:54, 16 September 2011 diff hist +297 Workshop Planning Activities No edit summary
- 02:4102:41, 16 September 2011 diff hist +290 Workshop Planning Activities No edit summary
- 02:3002:30, 16 September 2011 diff hist +68 OSE Shop 2011 →Instructions At This Stage
- 02:2602:26, 16 September 2011 diff hist +188 N Workshop Planning Activities Created page with "Planning this workshop began with defining the needs the building was intended to meet. We explored dependencies using mind maps in FreeMind and built design models using Google..."
- 02:1502:15, 16 September 2011 diff hist +115 N Site Preparation Instructions Created page with "Preparation of staging areas and building sites gets your project moving smoothly. ==STAGING AREA CONSIDERATIONS=="
- 02:0102:01, 16 September 2011 diff hist +6 OSE Roof Instructions →ASSEMBLY SHEET FOR WORKSHOP ROOF FRAMES current
- 01:2801:28, 16 September 2011 diff hist +132 OSE Roof Instructions No edit summary
- 00:0100:01, 16 September 2011 diff hist −2 OSE Roof Instructions No edit summary
15 September 2011
- 23:4323:43, 15 September 2011 diff hist +701 OSE Roof Instructions No edit summary
- 23:2923:29, 15 September 2011 diff hist 0 N File:Roof assembly layout.png No edit summary current
- 23:2223:22, 15 September 2011 diff hist −139 OSE Shop 2011 →Instructions At This Stage
- 23:1923:19, 15 September 2011 diff hist 0 OSE Shop 2011 →Instructions At This Stage
14 September 2011
- 03:4803:48, 14 September 2011 diff hist +1 OSE Roof Instructions →ASSEMBLY SHEET FOR SUPPLY SHED ROOF STRINGERS
- 03:4603:46, 14 September 2011 diff hist 0 N File:Roof Stringers.png No edit summary current
- 03:3703:37, 14 September 2011 diff hist +462 OSE Roof Instructions →ASSEMBLY SHEET FOR SUPPLY SHED ROOF STRINGERS
- 03:3403:34, 14 September 2011 diff hist +387 OSE Roof Instructions →ASSEMBLY SHEET FOR SUPPLY SHED ROOF STRINGERS
- 03:3003:30, 14 September 2011 diff hist +1,494 OSE Roof Instructions →ASSEMBLY SHEET FOR WORKSHOP ROOF STRINGERS
13 September 2011
- 18:1518:15, 13 September 2011 diff hist +27 OSE Shop 2011 →Instructions At This Stage
- 18:1318:13, 13 September 2011 diff hist 0 OSE Roof Instructions →ASSEMBLY SHEET FOR SUPPLY SHED ROOF STRINGERS
- 18:1218:12, 13 September 2011 diff hist +3 OSE Roof Instructions No edit summary