Integrated Scaling Strategy
Jump to navigation
Jump to search
Core
- $25k vs 120k labor - 4.8x lower labor cost based on OSE Build Cost.
- Formula: we give back 50% to the customer in added value, and 50% for the larger open source economy transition
Unique Features
- Integrated tools vBOM, materials, CAD, procedures - rapid, integrated learning.
- Tool manufacturing - construction tools
- Materials Manufacturing
- Solar concrete
- 100% renewable energy
- Certificates for tech schools: come up with a formula for pay scale, based on average starting salary, and value added based on their competency.
- Pay increase is determined by carefully developed formula for how much added value we are definitely produce (see Zones of Possibility)
- Field day: learn at home, and field day consists of building modules for us. This is their certification, according to a refined procedure.
- Field day: we build an entire house kit from scratch.