CEB Press Fabrication Drawings
Jump to navigation
Jump to search
Intro
For standards, see Sample Fabrication Drawing and combine with OSE CAD Title Block standard. For fabrication instructions of individual parts of the CEB press see A-Z Instructionals.
Overall Procedure
To facilitate one-off replication by independent producers, it is useful to include procedural hints - which can save many hours of fabrication time - over simply showing the parts a,nd expecting the fabricator to build them. The point of rapid teaching is to facilitate replication - and this is a critical piece of the OSE platform.
Suggested Pages
- Cut list and instructions + BOM. May fit on one or more pages. Parts drawings included, possibly on separate pages
- Please include illustrations of how to torch and calculations for how many sheets of 1/8" sheet metal we need for the following parts: 100080 100079 100062 100092 100060 100061 100074
- Hole drilling/punching list and instructions
- Main cylinder - plates, welding
- Main cylinder - hydraulic fittings, extension instructions (extend to fit in frame) (may combine with last item)
- Frame assembly instructions - main frame, jig, drilling technique, cover plates, bolting and torques
- Frame assembly - main cylinder insertion
- Frame assembly - includes cylinder side and front adjusters, sensor attachment, drawer adjustments
- Part drawings: drawer adjusters, front/back adjuster plates, sensor holder.
- Assembly - arms, legs, feet, hopper interface
- Parts - arms, legs, feet, hopper interface
- Drawer - fabrication (IN PROCESS, BEDDINGFIELD (12/17/11))
- Drawer - roller guides, mounting the guides, and insertion into frame, adjustment up and down
- Hopper - fabrication, supports, assembly
- Grate - parts, fabrication, mounting
- Shaker motor - parts, fabrication, assembly, mounting (IN PROCESS, BEDDINGFIELD (12/17/11)
- Controller - box, controller, sensors - explosion drawing
- Controller box - parts, assembly, connections, mounting
- Sensor - parts, assembly, mounting on holders, connection - 2 cylinders
- Solenoids - parts, assembly, mounting, wiring
- Hydraulics - explosion
- Hydraulics - main cylinder, secondary cylinder (bypass+flow control), solenoid from power cube, solenoid to active elements, shaker (with needle valve)
- Machine integration - mechanical function description, hydraulics wiring procedure, electric wiring procedure including battery connection, connection of machine to power, pressure settings, initial testing, software
Pages Submitted for Approval
Media:100076 SHAKER ASSEMBLY AND SUB COMPONENTS (10 PAGES).pdf