Prototypes Built and Cost

From Open Source Ecology
Jump to: navigation, search

See Global Village Construction Set.

Update end of 2012

Note: All entries in this graph are hyper-linked. Click Edit below the graph and then click twice on each image to access the link.

edit

Older

Note: All entries in this graph are hyper-linked. Click Edit below the graph and then click twice on each image to access the link.

edit

(NOTE: Needs to be updated for Turkey LifeTrac and another Power Cube VI by Tom and another CEB Press in Dec 18 Production run - total of 67)

Notes

Note: The official Civilization Starter Kit v0.01 was released for the versions of the machines as of December, 2011. See the graphic above for links to newer versions from 2012.

  • A total of 14 replications of GVCS machines has already occurred, including 2 small enterprises now producing Power Cubes and CEB Presses. These are various known replications worldwide (4 countries, 3 continents). There may be others from people who have not contacted us. Please let us know if you know of any.

Build Histories

Power Cube

  • In 2012, Tom Griffing built one Power Cube at Factor e Farm (in November's 2 day production run),
  • 2012: 2 for Factor e Farm (March and December)
  • 2012: one by Tom Griffing for Zach Dwiel (October).