Related changes
Jump to navigation
Jump to search
Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.
List of abbreviations:
- N
- This edit created a new page (also see list of new pages)
- m
- This is a minor edit
- b
- This edit was performed by a bot
- (±123)
- The page size changed by this number of bytes
9 January 2026
| 19:26 | Move log Marcin talk contribs moved page OSPD Method Conceptual Design to Open Source Product Development - Method Conceptual Design | ||||
|
|
N 19:23 | OSPD Method Conceptual Design 7 changes history +1,182 [Marcin (7×)] | |||
|
|
19:23 (cur | prev) +681 Marcin talk contribs | ||||
|
|
19:18 (cur | prev) +7 Marcin talk contribs | ||||
|
|
19:14 (cur | prev) +136 Marcin talk contribs | ||||
|
|
19:12 (cur | prev) +61 Marcin talk contribs | ||||
|
|
19:04 (cur | prev) +13 Marcin talk contribs | ||||
|
|
19:04 (cur | prev) +172 Marcin talk contribs | ||||
| N |
|
19:03 (cur | prev) +112 Marcin talk contribs (Created page with "*Include ZMCS Method from *Open_Source_Product_Development#Open_Source_Product_Development_Method_-_Roadmap") | |||
| N 19:02 | OSPD Method Industry Standards diffhist +59 Marcin talk contribs (Created page with "*Bold *The Lean Startup *OSPD in the literature") | ||||
8 January 2026
|
|
N 21:44 | OSPD Method Requirements + Value Proposition 7 changes history +1,740 [Marcin (7×)] | |||
|
|
21:44 (cur | prev) +95 Marcin talk contribs (→Specifications) | ||||
|
|
21:43 (cur | prev) +347 Marcin talk contribs (→General Approach) | ||||
|
|
21:41 (cur | prev) +36 Marcin talk contribs (→General Approach) | ||||
|
|
21:36 (cur | prev) +76 Marcin talk contribs (→General Approach) | ||||
|
|
21:36 (cur | prev) +411 Marcin talk contribs (→General Approach) | ||||
|
|
21:34 (cur | prev) +199 Marcin talk contribs | ||||
| N |
|
21:32 (cur | prev) +576 Marcin talk contribs (Created page with "*A process to grow a developer pool on the time scale of 2 weeks, and to complete a development process with 12 core developers, 100 collaborators, and 100 documenters. *Process must train for Design Guide level skillset - ability to design the product conceptually. *Process must develop both the product itself and the enterprise to produce that product - ie, achieve the full definition of a 'product' *Production can occur at many scales from one off to dozens or hundred...") | |||
3 January 2026
| 04:37 | Benchmarking diffhist +90 Marcin talk contribs (→Builder Crash Courses) | ||||