*Because the build method can be done as [[Swarming]], actual builds can be done as part of immersion training. This is because multiple elements of the design/buil can be done at the same time - allowing for an immersive learning environment with both theory and practice. This thus lends itself to a revenue model for movement entrepreneurs which combines education and production in one package - leading to a more robust economic model. | *Because the build method can be done as [[Swarming]], actual builds can be done as part of immersion training. This is because multiple elements of the design/buil can be done at the same time - allowing for an immersive learning environment with both theory and practice. This thus lends itself to a revenue model for movement entrepreneurs which combines education and production in one package - leading to a more robust economic model. | ||
=Entrepreneur= | =Build Entrepreneur= | ||
Swarming allows for accelerated build schedules with larger crews. for example, while a typical build may last 3-6 months [https://www.daveramsey.com/blog/how-long-does-it-take-to-build-a-house#:~:text=On%20average%2C%20it%20takes%20seven,2019%20U.S.%20Census%20Bureau%20report.&text=But%20you%20may%20also%20need,(1%E2%80%934%20months).&text=Then%20tack%20on%20another%20month,shovels%20can%20hit%20the%20dirt.], [https://www.realtor.com/advice/buy/how-long-does-it-take-to-build-a-house/] - an OSE-style build can take one week. This means that the | |||
=Links= | =Links= | ||
*[[OSE Scaling Matrix]] | *[[OSE Scaling Matrix]] |
Revision as of 00:03, 29 January 2021
Incentives -
- Home builder - appreciation on delivery, not over time
- Entrepreneur Builder - efficiency of open source, means a large margin of earned revenue from vertical integration.
- Tech school student - machines - teamwork, applied on site with mobile welding. Welder, torch, and power. Battery inverter, 250 lb. At 40 Wh/kg - 10kWhr. 20% dod - 2kWhr. Lightweight skid steer at 5000 lb or so of weight, not 10k. Field support for equipment is needed here. Finish of build means transporting the machine to the next site.
- Tech school student - builder - diversified training allowing them to go onto any job, from build crews to their own enterprise because they learn by diffusion.
- OSE Chapters Track - longer track, starts with build skills, which are core of graduating towards design, organization, entrepreneurship, leadership. This provides the right background of practical skills for building a new civilization. During the immersion physical work - there is also a build theory, design of house, machine design, organizations, communications, and other training.
Educator
- Because the build method can be done as Swarming, actual builds can be done as part of immersion training. This is because multiple elements of the design/buil can be done at the same time - allowing for an immersive learning environment with both theory and practice. This thus lends itself to a revenue model for movement entrepreneurs which combines education and production in one package - leading to a more robust economic model.
Build Entrepreneur
Swarming allows for accelerated build schedules with larger crews. for example, while a typical build may last 3-6 months [1], [2] - an OSE-style build can take one week. This means that the