Large Covered Structure: Difference between revisions
Jump to navigation
Jump to search
(Added some more sections) |
|||
Line 12: | Line 12: | ||
*[[On The Need for Dry Storage Areas in CEB Workflows]] (Similar "Core Issue" Covered) | *[[On The Need for Dry Storage Areas in CEB Workflows]] (Similar "Core Issue" Covered) | ||
= | =Sourcing= | ||
* | *Black tee - weld a nut on the tee side and it's a rebar clamp if you thread a set-bolt through the nut - $1.10 [https://www.menards.com/main/plumbing/pipe-fittings/black-pipe-fittings/stz-industries-reg-fip-black-pipe-tee/312t-12/p-1444437544126.htm] |
Revision as of 18:10, 20 March 2021
Basics
- This page goes over what is the lowest cost, fastest to build, permanent, but easily disassembled, structure that offers a large working space free from rain, wind, and snow? *This structure should be based on common industrial materials.
- For an engineered structure - steel is a good option
- Wind-shedding is a good option
Working Document
Internal Links
- On The Need for Dry Storage Areas in CEB Workflows (Similar "Core Issue" Covered)
Sourcing
- Black tee - weld a nut on the tee side and it's a rebar clamp if you thread a set-bolt through the nut - $1.10 [1]