Seed Home v2 Build Instructions: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
=Wall Module Build Instructions= | |||
*Catarina - [https://docs.google.com/presentation/d/1Oh_rc0LvIspXabpI9b2D2hqJHUH0Snr8j1O-WMx6A70/edit#slide=id.gdec218735e_0_116] | |||
=Fabrication Diagram= | =Fabrication Diagram= | ||
Also posted at [[Seed Home 2 Production]] | Also posted at [[Seed Home 2 Production]] |
Revision as of 01:23, 6 June 2021
Wall Module Build Instructions
- Catarina - [1]
Fabrication Diagram
Also posted at Seed Home 2 Production
The Fabrication Diagram is a visual representation of things that can be done in parallel vs sequentially, and is useful for OSE's Swarm Builds.
Site Plan
Painting Schedule + Build Cheatsheets + Visual Purchasing
- Seed Eco-Home Build Cheatsheets - ttrain a community organization across 10 cities. Market for widespread replication.
- Paint and Stain Doc - [2]
- Note that the Visual Purchasing doc mixes some build information with BOM information and can contribute to the Build Cheatsheets.
Inner Walls
Electrical
Bathroom and Kitchen
Sill Plate
Painting
Walls and Panel Construction
Foundation
- Utilities Locations source - [3]
- Foundation integration with house detail - Aspen_Foundation#Site_Plan
- Consider Seed Home 2 Workflow - detail on ergonomics of the foundation
Anchors
Howtos
Building Book for Seed Home 2
https://drive.google.com/drive/folders/1SZrTCkX9S_L8JSD_Dq_xeLDM53MP2vZq