Large Covered Structure: Difference between revisions
Jump to navigation
Jump to search
(7 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
*Wind-shedding is a good option | *Wind-shedding is a good option | ||
=Working Document= | =CAD= | ||
==Part Library== | |||
[[File:largehoop.png|100px]] | |||
<gallery perrow=6> | |||
File:largehoop.png|'''Large hoop structure made from 1/2" rebar.''' - FreeCAD -[[File:largehoop.fcstd]] | |||
</gallery> | |||
=Working Document - Original= | |||
<html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vRF137YRQ6RY2fowjU6QbpgYVh0w14nAa-LINv3q_ug3ZsbJoFCkBjGdph8RliHI6Ubx9HA_AwLZSyO/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> | <html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vRF137YRQ6RY2fowjU6QbpgYVh0w14nAa-LINv3q_ug3ZsbJoFCkBjGdph8RliHI6Ubx9HA_AwLZSyO/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> | ||
Line 14: | Line 25: | ||
=Sourcing= | =Sourcing= | ||
*Black tee - weld a nut on the tee side and it's a rebar clamp if you thread a set-bolt through the nut - $1.10 [https://www.menards.com/main/plumbing/pipe-fittings/black-pipe-fittings/stz-industries-reg-fip-black-pipe-tee/312t-12/p-1444437544126.htm] | *Black tee - weld a nut on the tee side and it's a rebar clamp if you thread a set-bolt through the nut - $1.10 [https://www.menards.com/main/plumbing/pipe-fittings/black-pipe-fittings/stz-industries-reg-fip-black-pipe-tee/312t-12/p-1444437544126.htm] | ||
=Key Related Work= | |||
*[[Rebar Truss Design Guide]] | |||
*Large gantries can be made for large (8' or larger) CNC machines [[CNC Sawmill]] |
Latest revision as of 21:32, 26 June 2021
Basics
- This page goes over what is the lowest cost, fastest to build, permanent, but easily disassembled, structure that offers a large working space free from rain, wind, and snow? *This structure should be based on common industrial materials.
- For an engineered structure - steel is a good option
- Wind-shedding is a good option
CAD
Part Library
Error creating thumbnail: File missing
- Error creating thumbnail: File missing
Large hoop structure made from 1/2" rebar. - FreeCAD -File:Largehoop.fcstd
Working Document - Original
Internal Links
- On The Need for Dry Storage Areas in CEB Workflows (Similar "Core Issue" Covered)
Sourcing
- Black tee - weld a nut on the tee side and it's a rebar clamp if you thread a set-bolt through the nut - $1.10 [1]
Key Related Work
- Rebar Truss Design Guide
- Large gantries can be made for large (8' or larger) CNC machines CNC Sawmill