OSE Theory of Efficient Builds: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 2: Line 2:


=It's all in the Prep=
=It's all in the Prep=
Applied to housing - one can prepare for rapid builds with jigs, modular design, preassembly of modules, [[Integrated Design]] of modules, and [[Design for Preassembly]].
Applied to housing - one can prepare for rapid [[Swarm Builds]] with jigs, modular design, preassembly of modules, [[Integrated Design]] of modules, and [[Design for Preassembly]]. An assumption of swarm builds is that such builds offer learning and a simplified build process - without reducing build performance.

Revision as of 20:13, 3 August 2023

This is nothing new, just building on elimination of muda, 6 Sigma, Test-Driven Design, Second Toyota Paradox, Visual Workshop, and other techniques for rapid builds.

It's all in the Prep

Applied to housing - one can prepare for rapid Swarm Builds with jigs, modular design, preassembly of modules, Integrated Design of modules, and Design for Preassembly. An assumption of swarm builds is that such builds offer learning and a simplified build process - without reducing build performance.