CEB Press Fabrication Procedure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
{{under construction}}
{{under construction}}
=Fabrication Procedure=
#Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) and workspace
##Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
#Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
##Stock steel (pictures from first build are desirable here)
##Hydrauilics (complete lists already documented on wiki, need to be organized)
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
=Frame, Drawer, Cylinder Mount=
#Build Frame
##Document step by step. Old instructions are still relevant, older documentation should be mined.

Revision as of 20:00, 6 June 2011

Under construction icon.png This page is currently under construction and might undergo drastic changes within a short span of time.


Fabrication Procedure

  1. Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) and workspace
    1. Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
  2. Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
    1. Stock steel (pictures from first build are desirable here)
    2. Hydrauilics (complete lists already documented on wiki, need to be organized)
    3. Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)


Frame, Drawer, Cylinder Mount

  1. Build Frame
    1. Document step by step. Old instructions are still relevant, older documentation should be mined.